ML19329C471
| ML19329C471 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 08/25/1977 |
| From: | Stolz J Office of Nuclear Reactor Regulation |
| To: | Roe L TOLEDO EDISON CO. |
| References | |
| NUDOCS 8002140851 | |
| Download: ML19329C471 (3) | |
Text
.- - _
,. _.... _.. _,., _ - ~ _.. _.. -.,
Di striMtic' Docket
-11e ELD PIRC POR (3) f' MC 25 577 Local PDR
~
Stello LUR 1 File K. Gollar l
R. S. Bovd G. Lear R. C. DeYoung P. Hannar D. B. Vassallo v Parrish Docket No. 50-346 F. J. Willians J. Stolz E. Hylton Toledo Edison Company R. J. 'fattson, SS bcc: J. R. '4uchanan, j
ATTN: Mr. Lowell E. Roe D. Ross, SS
" SIC i
Vice President, facilities J. P. Knight, SS T. B. %ernathy, TI Development R. Tedesco, SS ACRS (16)
Edison Plaza H. Denton,0SE
)
300 Madison Avenue V. A. " core, OSF Toledo, Ohio 43652 R. H. Vollmer, DSE Pt. L. Erns,t, OSE Gentlemen:
U. P. Garrlill, OSE 4
SUBJECT:
LARGE 3REAK SPECTRUM TO DCCL7!ENT THE EXACT MARGINS WITHPl THE ECCS ACCEPTANCE CRITERIA 0F 10 CFR PART 50.a6 - DAVIS-BESSE, UNIT 1 As you know, license condition 2.C.(3)(1) of Facility Operating License No. hPF-3, issued for Davis-Cesse, Unit 1 on April 22, 1977 recuires in part, that within six months from issuance of said license, the Toledo Edison Company shall provide additional supporting analyses for the large break spectrun to document the exact margins within the Eracrqency Core Cooling System acceptance criteria of 10 CFR Part 50.46.
~
1 On June 23, 1977, representatives of the Toledo Edison Company, the 1
Babcock and Wilcox Conpar
- and the staff discussed the additional large break s;'ectrum required to meet license condition 2.C.(3)(1 ).
At this meeting, the Toledo Edison Company and the Babcock and Milcox Cenpany were advised that the large break analyses required (using the latest staff model as approved by the staff and wholly in conformance with 10 CFR Part 50.46 and Appendix K) are as follows:
FOR CAVIS-BESSE, UNIT 1 BREAK SIZE DISCHARGE BREAK TYPE (Square feet)
COEFFICIENT DESCRIPTION (1) 8.55 1.0 Split, pump discharge (PD)
] 8.55 1.0 Double ended pump discharge (DEPn)
. 8.55 1.0 Double ended pump suction (DEPS) g g.
l l?
m.
\\.,_....
- v._
u
- - ma.====> = - m.-._ _..
a c
+
3 E 2 U 077 Toledo Edison Cocpany These analyses must be submitted no later than October 22.1977 to meet the license condition as stipulated in Paragraph 2.C.(3)(1) of Facility Operating License No. MPF-3. We request that you keep us advised on the status of completing these analyses within the tino required.
Sincerely.
Original siane 1 by John F. Stolz John F. Sto?z, Chief Light Water Reactors firanch No.1 Division of Project Manageeent cc: !!r. Donald 18 Hauser, Esq.
The Cleveland Electric Illuninating Comny P. 0. Box S000 Cleveland, Chfo 41101 Ceralrt Charreff, Ece.
Sh m, Pit'ren, Potts and Tr M ridqe 1800 M Street,': ii.
Washington, D. C.
20036
' asi te l'9rry, Esq.
Foiler, h nev, Mnrf and ?>cde;2 3CO adisGC Avrnue
'olodo, Chio 436C4 l
4 (Q.5 /
JV LWR} c kh LWR 1 _
~
o,,,c.,
LEngife6 Jfiazetis iSto N '
7/Q/77 JQ7/77
$/*[/7)
J u v.
r m..== i.v. -==.=4 Nac roux 3is (9 76) ancx o24o.
.s._,