Text
'
.~
Distr lion:
Courtes9 copy to JCAE Docket (
Z DR Reading DRL Reading.
PWR-3 Reading LMMuntzing -
RCDeYoung, DRL-9 2..,,
~ " "
Attorney, OGC-BSchur, OGC OCR (2)
GErtter, DR (DR-4092)
VHWilson, DRL
/
4 Nr. Edward J. Bauser Executive Director Joint Comittee on Atocile Energy Congress of the United States
Dear Mr. Bauser:
This is in response to your letter of January 11, 1972, which included a letter from Congressman William Stanton trans:aitting the concerns of Mr. Bill Block of Chesterland, Ohio. Mr. Block was aspecially concerned about the Davis-Besse nuclear pcuer plant located in Carroll Tcwnship, Ottawa County.
I am enclosing staff ccer:ents in response to your request, and if I can provide further infomation, please let me know.
Sincerely, Sti ical li ted by t
f retw a. a.m.
Peter A. Morris, Direc+wr Division of Raactor Licensing Er. closure:
Staff Cerr.ents w/encls.
bcc: Chairman Schlesinger Comissioner Ramey Comissioner Johnson Comissioner Larson Comissioner Doub Secretariat (2)
General Manager (2) k
(( DOCR I
C
/
b 01/?F]72 DRL PWR-3 DRL:AD/PWRs DRL:DIR OGC DR:
omcE>
. DBL.:.EWR-3 L
sunnus. DCrutchf.i.gld....KR. Goll er RCDeYoung,,,, PAM ris Li
. 01/.21H2.....}01/...../.72 01.L.../72... 01LL.k/72 01/
/72 L
DATE >
Farm AEC-Ste tRev.9-33) AECM 0240
- v. s. coyn:nant entNT No orrics : me o. eos.34e 8002 ISO 7f2 CJ
~3TRIBUTION:
Courtesy, copy to J,CAE Docket,
w3 DR Reading
\\
DRL Reading PWR-3 Reading IXMuntzing, DR
\\
RCDeYoung, DRL
\\
Attorney, OGC 3Schur, OGC OCR (2)
\\
GErtter, DR'(DR 114092)
VhVilson, DRL Hr. Edward J. 3suser Executive Director Joint e - 4ttee on Atossic Energy Congress of the United States
Dear Mr. Jauser:
31s is in response to your letter of January 11, 1972, which included a letter from Congressaan Willisan Stanton transmitting the concerns of Mr. 3111 31ock of Ctesterland, asio. Mr. 31ock was especially concerned i
about tha Davis-Zesse nuclear power plant located in Carroll Township, Cttawa County. I sua enclosing staff cets in response to your request, and if I can provide further information, please let se 'ecw.
Sincerely, 1
l L. Hanning Munt:ing Director of Regulation
Enclosure:
Staff Comments v/encia.
bec: Chairman Schlesinger
{
Commissioner Ramey Ccemissioner Johnson Commissioner Larson 1
Cot =:lissioner Doub Secretariat (2)
General Manager (2) s i
\\
1/ /72 orncE> ;DRL:PWR-3;gg;g;gpk-DRL:PWR-3---- :g--
-DRL:A.D/PWRs ! DRL:DIR l
g q ------ p;----
-(-- - -
- - - -DR:DIR su==g
- DC,r,ucchf,1, eld KRG,6J1er_,_,,R,_ e, Young _,,,PAMorris__ !,__/,
IllMuntzing_
DATE >... '
Form AEC-318 (Rev. 9-53) u.s. sovninutzt rmutme erria. t me-o- 3 sees
CQ4MENTS IN RESPONSE TO THE LETTER OF MR. BILL BLOCK Information relative to Mr. Block's concerns may be found in the enclosed booklets entitled, " Licensing of Power Reactors", " Atomic Power Safety",
" Nuclear Power and the Environment", and " Nuclear Power Plants".
Another specific source of information on the nature, scope and results of the safety review that was conducted prior to the issuance of the construction permit for the Davis-Besse plant is the AEC regulatory staff's Safety Evaluation, dated November 2,1970. A copy of this is also enclosed.
It should be noted that the review covered such areas as the site and its environs, the design of plant engineered safety features, hypothetical accidents and their mitigation and consequences, and the technical quali-fications of the applicant and his contractors to design and construct a nuclear power plant.
The detailed review and evaluation by the regulatory staff at the construction permit phase is only the first step in the continuing review by the Atomic Energy Commission's regulatory staff covering the design, construction and operating features of the Davis-Besse plant.
During the construction of the facility, members of the regulatory staff will periedically inspect the plant to assure that all of the requirements of the construction permit are met.
When the final design is completed and construction is entering its final stages, the owners of Davis-Besse will apply to the AEC for a license to operate the facility.
This application will include detailed plans for safely operating the plant and coping with emergency situations as well as the final design of the reactor including such things as the engineered safety features and waste handling systems.
Once again the regulatory staff will undertake a detailed review of the safety aspects of the plant and will publish its conclusions in its Safety Evaluation which is made available to the public.
If an operating license is issued, the review and inspection by the AEC does not stop. Periodically representatives of the regulatory staff inspect the plant to certify that operations are being carried out in accordance with the terms of the license.
There fore, the plant is under review by technical experts prior to the time construction is permitted, during construction, prior to issuance of an operating license and during operation.
O
- 3 D'
2-3 The construction permit for the Davis-Besse plant was issued on March 24,
. 1971. Since that time, construction has progressed satisfactorily and the plant is now more than 137. complete.
Mr. Block raised concern about how nuclear plants,-such as Davis-Besse are insured. A copy of a discussion of the Price-Anderson Act which further deals with nuclear. liability insurance is also enclosed.
Enclosures:
1.
" Licensing of Power Reactors" 2.
" Atomic Power Safety" 3.
" Nuclear Power and the Environment" 4.
" Nuclear Power Plants" 5.
Safety Evaluation 6.
Price-Anderson Act e
O 3
D 4
h-J e
T t
7
--.