ML19329B932

From kanterella
Jump to navigation Jump to search
Forwards 770929 Fr Notice 189 Delaying Implementation of Physical Search Requirement.Sent to All Power Reactor Licensees & All OL Applicants
ML19329B932
Person / Time
Site: Davis Besse 
Issue date: 11/28/1977
From: Case E
Office of Nuclear Reactor Regulation
To: Roe L
TOLEDO EDISON CO.
Shared Package
ML19329B933 List:
References
NUDOCS 8002070520
Download: ML19329B932 (2)


Text

s 8

UNITEO STATES j

NUCLEAR REGULATORY COMMISSIL..

pg i

WASHINGTON, D. C. 20566

, j e

% [,,g +

November 28, 1977 Docket No. 50-346 TO ALL POWER REACTOR LICENSEES (DAVIS-BESSE NUCLEAR POWER STATION, UNIT 1) AND ALL APPLICANTS WITH APPLICATIONS FOR A LICENSE TO OPERATE A POWER REACTOR Toledo Edison Compacy ATTN:

Mr. Lowell E. Roe Vice President - Facilities Development Gentlemen:

RE: AMEN 0 MENT TO 10 CFR 73.55 This letter is being sent to all licensees authorized to operate a nuclear power reactor and to all applicants with applications for a license to operate a power reactor to advise you that the Nuclear Regulatory Commission has published in the FEDERAL REGISTER (Vol. 42, No.189, September 29,1977) an effective amenament to its ragulation 10 CFR 73.55, " Requirements for Physical Protection of Licensed Activities in Nuclear Power Reactors Against Industrial Sabotage."

A copy of the FEDERAL REGISTER notice is enclosed. The amendment delays implementation of the physical search requirement of paragraph (d)(1) for regular employees of a licensee at the site at which the licensee is authorized to operate a nuclear power reactor until August 24, 1978 unless the Comission directs otherwise prior to that date.

In keeping with the above, the NRR staff position as to acceptable methods of implementing the attached effective rule has been changed.

Guidance (dated September 30,1977) for complying with the performance requirement of paragr.aph (d)(1) for searching of all individuals entering the protected area is enclosed.

For any further information on the implementation of the search requirement, please contact James R. Miller, Assistant Director for Reactor Safeguards at 301-492-7014.

Sincerely,

.I i

/

Edson G. Case, Acting Director g

Office of Nuclear Reactor Regulation

Enclosures:

1.

Effective Rule 2.

Position on Personnel Search Requirements cc: See next page(s) 8002070 M O

,3 :k o n, _' ' m f

o i

i J

1 cc: ' Donald H. Hauser, Esq.

'Ine Cleveland Electric Illuminating Company

, P. O. Box 5000 Cleveland, Ohio 44101 i

Gerald Charnoff, Esq.

l Shaw, Pitt: nan, Potts & Trowbridge 1

-1800 M Street, N.sv.

j

'dashington, D. C.

20036 i

Inslie Henry, Esq.

Fuller, Seney, Henry & Hodge 300 Madison Avenue

'Icledo, Ohio 43604

't l

6 1

4 i

I e-O i

-.r

<,,, -. _, _ _,.._.. _ ~, _ _.-,

,c.v

--