ML19329B911

From kanterella
Jump to navigation Jump to search
Forwards RO NP-33-77-01
Date released: 12/09/2019 Download: ML19329B911


RO NP-33-77-01:on 770429,test Signal Inserted to Power Range Caused High Voltage Cutoff to Both Source Range Instruments.Caused by Procedure Inadequacy.Procedure Modified
ML19329B915
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 05/29/1977
From: Batch S, Lingenfelter J
TOLEDO EDISON CO.
To:
References
Download: ML19329B915 (2)
Forwards RO NP-33-77-01
ML19329B910
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 05/25/1977
From: Roe L
TOLEDO EDISON CO.
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19329B910 (1)