05000346/LER-1978-023-03, /03L-0:on 780224,temp Indication for Reactor Protection Sys Channel 2 Spiked Tripping Channel & Shut Down Reactor.Caused by Faulty Connector Due to Dirt on Contacts. Channel 2 Temp String Modules Removed & Connectors Cleaned

From kanterella
(Redirected from ML19329B866)
Jump to navigation Jump to search
/03L-0:on 780224,temp Indication for Reactor Protection Sys Channel 2 Spiked Tripping Channel & Shut Down Reactor.Caused by Faulty Connector Due to Dirt on Contacts. Channel 2 Temp String Modules Removed & Connectors Cleaned
ML19329B866
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 03/21/1978
From: Kovach S
TOLEDO EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19329B803 List:
References
LER-78-023-03L, LER-78-23-3L, NUDOCS 8002060873
Download: ML19329B866 (3)


LER-1978-023, /03L-0:on 780224,temp Indication for Reactor Protection Sys Channel 2 Spiked Tripping Channel & Shut Down Reactor.Caused by Faulty Connector Due to Dirt on Contacts. Channel 2 Temp String Modules Removed & Connectors Cleaned
Event date:
Report date:
3461978023R03 - NRC Website

text

- _-

~

COh4 TROL BLOCK: l l l

l l

lh (PLEAsE PRINT OR TYTE ALL,REQUIREO INFORMATIONI l

6 l 0l Hj Dl B l Sl 1l@l 0 l 0 ] -l 0 } 0 l N l P l 7 l -l 0 l 3 l@l 4 l 1l 1 l 1l 1l@l l

l@

7 9

LICENSEE CODE 14 15 LICENSE NUMBER 2S 26 LICENSE TYPg JO 5 7 CAT 58

,"eg l L)@l cl 510l -l Gl 3l 416 @l O! 21214l 718 l@( 0l 3l 2( 117 l 8 l@

I 8

60 68 OOCKET NUM8ER 68 69 EVENY D ATE 74 75 REPORT DATE 80 3

EVENT DESCRIPTION ANO PROB ABLE CONSEQUENCES h l

I O I 2 I l On 2/24/78 at 0554 hours0.00641 days <br />0.154 hours <br />9.160053e-4 weeks <br />2.10797e-4 months <br />, Reactor Protection System (RPS) Channel 2 high tennerature Io ial I indication " spiked", 4-ediately tripping the channel. The channel was declared in-l J

l operable placing the unit in Action Statement 3 of Tech Spec 3.3.1.1, which recuires [O ;4 l l o q s ; l reactor coolant hig'a te=perature indication in Modes 1 and 2.

There was no actual l

IO t6 l l Reactor Co61 ant Sys tem high tecoerature. Te=cerature indication for RPS Channel 2 l

l 0 l 7 l l rose above the high limit for only a few me=ents (Soiked). which trioped the I

i O I e l I channel and shutdown the reactor.

(NF-33-78-28).

I 80 SYSTEM

CAUSE

CAUSE COMP.

VALVE COCE CODE SUSCOCE COMPONENT CCCE SUSCODE SUSCODE lC}9l l Rl Bl@ l X ]@ l Z l@ lI lN lS lT lR lU lh lXl@ lZj@

7 8

9 to 11 12 13 18 39 20 SEQUENTIAL OCCU R R ENCE REPORT REVISION EVENT YEA R*

REPORT NO.

COCE TYPE N O.

@,asg!RO 17 la l

]_]

l0l2l3l l-l l 013 l ltl l_l l 0l LEP g

_ 23 22 23 24 26 27 28 29 30 31 32 u

TKN 'AC O ON P T

ME HOURS S8 i FOR 8.

SUPPLI E R MANLFACTURER (3

) I X l@l Zl@

lAl@

lC j@

l 0] ll 01 3l lYl@

l Yl@

l Nl@

lB lC l4 l 5l@

g

/ 33 34 35 36 37 40 41 42 43 44 47 CAUSE OESCRIPTION ANO CORRECTIVE ACTIONS i,;o;lThe reactor trip resulting from the trip of RPS Channel 2 re=oved the unit from l

,,,,,l Action 3 of Technical Specification 3.3.1.1.

The apparent cause is believed to have

been a faulty connector at the linear bridge module due to dirt on its contacts. All l
RPS Channel 2 te=perature string modules were recoved and the connectors cleaned.

l I

l i 141 1 80 7

8 9 5A

% POWER ETHER STATUS cl R

OtSCoVERY DESCRIPTION l115 l l E lh l Gl 7l 2lhl NA l

lAl@l Reactor. Trip l

44 45 46 80 7

8 1

12 11 RELEASED OF RELEASE AMOUNT OF ACTIVITY

. LOCATION oF RELEASE l1161 l Z l @ lZ l@lNA l

lNA l

44 45 80 7

8 9 10 11 PERSONNEL EXPOSURES NUMS E R TYPE

DESCRIPTION

l li l 21 101010 @l Z I@l NA PERSONNELINJU IES NUYBER CESCRIPTION li ia l 101 c i c l@l NA 80 I

7 8 9 11 12 LCSS OF CR DAMAGE TO F ACILlTV 8 0 0 2 o n n M 73 l

[

Tyst CESCp;PTION 1 '] I :l@l NA l

80 C 6 9 10 ist.;

C E5CpiPTION i

i i i i i i i: i i i i i:l n l u i s tei n 68 69 GJ g 0 to 30 PH ON E:419-250-5000. Ext. 23A y a.,.E O F P R E D A R E R

=

TOLEDO EDISON COMPANY DAVIS-BESSE UNIT ONE NUCLEAR POWER STATION g

SUPPLEMENTAL INFORMATION FOR LER NP-33-78-28 tG DATE OF EVENT:

February 24, 1978 FACILITY: Davis-Besse Unit 1 IDENTIFICATION OF OCCURRENCE: Reactor Protection System (RPS) Channel 2 high temperature trip and resultant reactor trip.

The unit was in Mode 1, with Power (MWT) = 2058 Conditions Prior to Occurrence:

and Load (MWE) = 720.

Description of Occurrence: On February 24,1978 at 0554 hours0.00641 days <br />0.154 hours <br />9.160053e-4 weeks <br />2.10797e-4 months <br />, RPS Channel 2 high temperature indication " spiked" immediately tripping the channel and the reactor.

RPS Channel 3 had tripped on February 23,1978 (Licensee Event Report NP-33-78-24).

Since the Technical Specification requires the channel to be in the " tripped" mode rather than the " bypass" mode, when Channel 2 tripped, the "tvo out of four" logic was satisfied and the reactor was trippe.d by the RPS.

The inoperable channel placed the unit in Action Statement 3 of Technical Specification 3.3.1.1, which requires reactor coolant high temperature instrumentation to be operable in Modes h1 and 2.

This Action Statement requires that the ' inoperable channel be placed in

/ the " tripped" condition within one hour. RPS Channel 2 was tripped immediately by the spike.

Designation of Anparent Cause of Occurrence:

The cause of. this occurrence is believed to have originated at a connector at the linear bridge =odule.

Instru-ment and Control personnel found dirt on a connec1!or at this module.

Analysis of Occurrence: There was no danger to the health and safety of the public or to unit personnel. There was no actual Reactor Coolant Syste= high temperature.

Temperature indication for RPS Channel 2 rose above the high limit for only a few moments (" spiked"), which tr1pped the channel and shut down the reactor.

l

Corrective Action

All RPS Channel 2 te=perature string modules were removed, and all connectors cleaned under Maintenance Work Order I&C 218-78. After the appli-cable sections of Survel.' lance Test ST 5030.02, "EPS Monthly Check" were perfor=ed, Channel 2 was returned to operable status on February 25, 1978.

Channel 3 was restored to operable statu: on February 26, 1978.

The unit was re=oved from Action State =ent 3 of Technical Specification 3.3.1.1 i==ediately after the RFS Chtnnel 2 trip and resultant reactor trip. The trip placed the unit in Mode 3.

  • 'he Technical Specification applies only while in Modes 1 or 2.

I

\\

LER B78-023 e

~

'h;;;:

TOLEDO EDISON COMPMW DAVIS-BESSE UNIT ONE NUCLEAR POWER STATION PAGE 2 SUPPLEMENTAL INFORMATION FOR LER NP-33-78-28

, I d. -.

. -p.,

Failure Data: There have been no previously reporcable RPS Channel 2 high tempera-ture trips.

LER #78-023 O

e l

1 J

1 e e l