ML19329B745

From kanterella
Jump to navigation Jump to search
Ack Receipt of Re Piping Tack Welds Performed by Unqualified Welders
ML19329B745
Person / Time
Site: Davis Besse 
Issue date: 03/18/1973
From: Kruesi F
US ATOMIC ENERGY COMMISSION (AEC)
To: Sampson G
TOLEDO EDISON CO.
References
CDR-52, NUDOCS 8002060754
Download: ML19329B745 (1)


Text

_ _ _ _ _.

I D"

D OQ

-- ]L

.L

_a

..v i

Toledo Edison Company Docket No. 50-346 j

ATM:

G. J. Sampson Bef. CDR-52 Vice President Fouer Edisea Plaza rolado, chi. u.32 Gentlemos:

thank you for your report dated February 12, 1973, concerning welders i

mot qualified in accordance with the applicable codes that made tack welds in Class 1 pipias installed in your Davis-Besse facility. The needestructive tests of the affected welds and records relating thereto, will be reew during our continaias inspection program. Should t

additional information be required relating to this problem, you will be contacted througin our office in Glen Ellyn, Illinois.

{

Your cooperation concerning this metter is appreciated.

l Yours truly,

~"

l Or:ginal signed by i

F. E Kruesi F. E. Irussi, Director of Esgulatory Operations bec: L. Rogers, R$

B. H. Crier, RO:III i

P. A. Morris, RO M. Steele, RO j

H. D. Thornburg, 20 L. Reeder, RO 1

i R. H. Engelken, RO M -Central Files R. S. Boyd, L DR Reading Files R. C. DeYoung, L PDR F. Schroeder, L Local PDR

)

l J. G. Keppler, RO NSIC l

C. W. Reinmuth, RO DTIE, OR A.

  • h er, L l

i i

I i

RO RO RO RO DEWhitsell: elm JaBenderson ruragelken EEKrossi i

l I-7451 3/14/73 3/ /73 3/,/73 3/ /73 y,, ;s t

80020607bk' 3

..