Forwards Draft Input for SER from Instrumentation & Control Sys Branch.Lists Unresolved Items
ML19329B675
Person / Time
Site: Davis Besse 
Issue date: 03/02/1977
From: Tedesco R
Office of Nuclear Reactor Regulation
To: Vassallo D
Office of Nuclear Reactor Regulation
Shared Package
ML19329B677 List:
References
NUDOCS 8002050781
Download: ML19329B675 (2)


Text

~

rl 9

b

_D If(

D Y2 02M mpg-Docket No. 50-346 Y3 TfE!!0FANDLH FOR: Domenic B. Vassallo, Assistant Director for Light Water Reactors DPM FROM:

Robert L. Tedesco, Assistant Director for Plant Systems, DSS

SUBJECT:

DAVIS SESSE U3!IT 1 SAFETY EVALUATION REPORT SUPPLEMENT 12 Plant Name:

Cavis Besse Unit 1 Cocket Number:

50-346 Licensing Stage:

OL Milestone fiumber:

27-22 Responsible Branch LWR 2 and Project. Manager:

L. Engle Requested Completion Date:

February 23, 1977 The DSS:PS, Instrumentation and Control Systens Branch supple:rtntal input t. the Davis Besse Unit 1 Safety Evaluation Report (SER) dated Dece=ber 1976, was trans::iitted by mexrandum to you cn December 23, 1976.

That input was based on our review of the FSAR tnrough Anend. ment 39 and, in part, Acendment 40.

Several items in tnat transmittal were identified as subjects to be addressed in an SER suppiescent. The enclosed supplementary report addresses these items and presents the results of our review through /cendaent 43.

It should be noted that som, but not all, of the itens identified in the provicus transmittals have been resolved. The following items are these that have not been satisfactorily resolved and remain as outst:nding itms. de will report on our evaluation of these open itcas in the next supplenent to the Safety Evaluation Report.

1.

Final approval of the routing of Class 1 wiring with non-Class 1E wiring within Class lE logic cabinets and panels. Resolution subject to verification tests yet to be submitted by the applicant demonstrating adequate isolation and separation between the safety and non-safety systen (SSER J2 Section 7.2).

2.

Final resolution of the applicant's modifications for the reactor coolant flow transmitters yet to be subnitted (SSE.1 f2 Section 7.2).

Contact:

A. J S:ukiewicz avor;-g

.wi w

orrecs >

gunesamE D

t. -

Forma ABC.313 (Rav. 5MH ABCM 0240 TT u. s. novsmausat ematino orricas son.eae see 8002050]l

Domenic B. Vassallo 2

= c ; g77 3.

Final approval of the applicant's separation criteria for redundant conduits (SSER !2 Section 7.9.2).

Resolution subject to final verification tests yet to be sulnitted.

4.

Final approval of the Class lE electrical distribution system (i.e., the Millstone 2 concerns). Resolution subject to receipt of the applicant's complete analysis (scheduled for March 4,1977) (SSER 12 Section 0.2).

5.

Final approval of the Decay Heat Removal Valve Systen (SSER Section 7.3.4 dated December 28, 1976). Resolution subject to concurrence from Reactor Systems Branch.

cem ' s =-

-c R&u:

  • 7: ::2 Robert L. Tedesco, Assistant Directc; for Plant Systens Division of Systems Safety

Enclosure:

As Stated cc:

S. Hanauer R. Heineman R. Boyd W. Mcdonald T. Ippolito J. Stolz L. Engle C. Miller M. Srinivas n F. Jablonski (Region III)

J. Mazetis A. Szukiewicz F.-Rosa DISTRIBUTION DOCKET FILE NRR READING FILE PS READING FILE ICS READING FILE R. L. TEDESCO

-S PS:ICSB ;,,

PS: %

P(QCSB

%':f) o,,....

M6e@cz CFM;hr TAfdpoi_,d_ / 'LT'edesco R

3/ [f77 '

3/ 1/77 3/?./77 '

3/ F/77 Form 6313 (Rev. 7 $3) AEQ4 02o0 W u. s. oovannusne paintino orrecs sore.sas.ies