ML19329B615
| ML19329B615 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse, North Anna, Crystal River, 05000514, 05000515, Washington Public Power Supply System |
| Issue date: | 08/27/1975 |
| From: | Schwencer A Office of Nuclear Reactor Regulation |
| To: | Wiggington D Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8002050732 | |
| Download: ML19329B615 (2) | |
Text
'
p 3iFL-D k
D Distribution:
h Docket File- < * '
Lim 2-3 File 9
AUG.L.T 1975
- Sch e.ccr EGoulbourne David L. i'iggingtcn, Cenicr Staff Assistant, Divisicn of Peactor Licensir.g
.ME EII'E ECCK - SIGTIFICN.T DETAYS Crvatal River-3 (CL) (Pace 2-20)
Issuance of Supplenent Ib. 2 to Sm 13 heirrJ slipped frcm Octcher 1, 1975 to Jan:ary 7,1976 to n-hte cyanied firancial evaluaticn due to cddirz; curars, to review new retecrclogical data and to allow n core tie to ccrplate the ICCG-??C aralysis. This 3 renth slip will rot ircact F;D %ich, i.,c Mmtly, haa teen Lpzmsi f:tn :*ay 1975 to February 7, 1975.
C.wis-Besse 1 (CL) (Pace 2-21)
Scrah11a la bei.g al W l ncnth at Draft Sm ccr.cletien arrl all reainirq milestenes erygt PCD @.ich will rot be irpactol. Mirpcse of clip is to allcw ti e to resolve cpen itons (cvs 12) ard to allcw n :ncra time to cc:plete ECC3-F.'C aralysis (being extenled frcm 2ugust 15,1975 to January 12, 1976).
- brth arra
' Pa dwclliny SER inputs vill be delayed tg to three renths due to lata applicant subnittals. LE! is plannirxJ Pre-;CS Sm supoltrent to minimize scPerhila 1::r:act. Ecst estirata at this ti e irdicates
- 3C, Ic"S reeting arri > cst ;CES EEa supplarent will slip 2 rer:ths.
':e c'o rot plan slip start of heari.m due to these slips. Sirre all
.substantive 4wea will be kncwn follcuing the 7CBS reetim..
Im 1 & 4 CRL has. v.tal CEID efforts to rave up start of Pad Safety Twing fran rovster 1975 to Septrier 23, 1975 sirce all safety issues e>rept N.AP will be resolved by then. Idva.tges will te a 1 renth irproverent in PCD, tie have also askei OctD to assist in cbtair.irr; an early ?sLa action needed to issue an crarded no.-2 to premnt a construction steppage een site actiWJ.es presently authcrical are cxrpleted.
80020507 9-
-=-
3
~
AUG.2 i13'/5
,m Ott/id L. Wiggington,
Pebble Sprims Principally.he to lack of timely C.P.S.G.S. re/iw (a ch7.onical ranagerent rreblen rot ccnfined to this review) plus late inputs frr.a TR (iml'xiir:g a third round cf rsp f=n EI&C a:xi pcssibly frcra Pro) will cause SER isstance to slip at least 3 renths. All subseq.:ent :2ilestenes will be affecte3, by at least 2 renths.
Original signed b'1 A schwencer A. Ech,ercer, Chief Light Uater ?m ' < s Erarch 2-3 Divisicn of P.eactor Licensi:q Attaci=amts:
Icgic Net d for L% Projex:ts cc:
V. 't.
'ocro L. Encle R. Ferguscn T. Ccx C. Stahle D
p$N' M"
I RL:IIiR 2,,3,,,,,
,, ~,,,, _.,, _,,,, _
4_
OPF1CE >
euw4av >
b oA7s >
.. ~ _...
Form.%)11 (Rar. 7-53) AECM 0240
- u.s.sowan=muneperwrrwo oPrecrTer) no.see
.,