Discusses Sept Blue Book.Explains Significant Delays
ML19329B615
Person / Time
Site: Davis Besse, North Anna, Crystal River, 05000514, 05000515, Washington Public Power Supply System  Duke Energy icon.png
Issue date: 08/27/1975
From: Schwencer A
Office of Nuclear Reactor Regulation
To: Wiggington D
Office of Nuclear Reactor Regulation
References
NUDOCS 8002050732
Download: ML19329B615 (2)


Text

'

p 3iFL-D k

D Distribution:

h Docket File- < * '

Lim 2-3 File 9

AUG.L.T 1975

Sch e.ccr EGoulbourne David L. i'iggingtcn, Cenicr Staff Assistant, Divisicn of Peactor Licensir.g

.ME EII'E ECCK - SIGTIFICN.T DETAYS Crvatal River-3 (CL) (Pace 2-20)

Issuance of Supplenent Ib. 2 to Sm 13 heirrJ slipped frcm Octcher 1, 1975 to Jan:ary 7,1976 to n-hte cyanied firancial evaluaticn due to cddirz; curars, to review new retecrclogical data and to allow n core tie to ccrplate the ICCG-??C aralysis. This 3 renth slip will rot ircact F;D %ich, i.,c Mmtly, haa teen Lpzmsi f:tn :*ay 1975 to February 7, 1975.

C.wis-Besse 1 (CL) (Pace 2-21)

Scrah11a la bei.g al W l ncnth at Draft Sm ccr.cletien arrl all reainirq milestenes erygt PCD @.ich will rot be irpactol. Mirpcse of clip is to allcw ti e to resolve cpen itons (cvs 12) ard to allcw n :ncra time to cc:plete ECC3-F.'C aralysis (being extenled frcm 2ugust 15,1975 to January 12, 1976).

brth arra

' Pa dwclliny SER inputs vill be delayed tg to three renths due to lata applicant subnittals. LE! is plannirxJ Pre-;CS Sm supoltrent to minimize scPerhila 1::r:act. Ecst estirata at this ti e irdicates

3C, Ic"S reeting arri > cst ;CES EEa supplarent will slip 2 rer:ths.

':e c'o rot plan slip start of heari.m due to these slips. Sirre all

.substantive 4wea will be kncwn follcuing the 7CBS reetim..

Im 1 & 4 CRL has. v.tal CEID efforts to rave up start of Pad Safety Twing fran rovster 1975 to Septrier 23, 1975 sirce all safety issues e>rept N.AP will be resolved by then. Idva.tges will te a 1 renth irproverent in PCD, tie have also askei OctD to assist in cbtair.irr; an early ?sLa action needed to issue an crarded no.-2 to premnt a construction steppage een site actiWJ.es presently authcrical are cxrpleted.

80020507 9-

-=-

3

~

AUG.2 i13'/5

,m Ott/id L. Wiggington,

Pebble Sprims Principally.he to lack of timely C.P.S.G.S. re/iw (a ch7.onical ranagerent rreblen rot ccnfined to this review) plus late inputs frr.a TR (iml'xiir:g a third round cf rsp f=n EI&C a:xi pcssibly frcra Pro) will cause SER isstance to slip at least 3 renths. All subseq.:ent :2ilestenes will be affecte3, by at least 2 renths.

Original signed b'1 A schwencer A. Ech,ercer, Chief Light Uater ?m ' < s Erarch 2-3 Divisicn of P.eactor Licensi:q Attaci=amts:

Icgic Net d for L% Projex:ts cc:

V. 't.

'ocro L. Encle R. Ferguscn T. Ccx C. Stahle D

p$N' M"

I RL:IIiR 2,,3,,,,,

,, ~,,,, _.,, _,,,, _

4_

OPF1CE >

euw4av >

b oA7s >

.. ~ _...

Form.%)11 (Rar. 7-53) AECM 0240

  1. u.s.sowan=muneperwrrwo oPrecrTer) no.see

.,