1
.
,
'
l..
7
4
s'
,
t
M
%
UNITED STATES
5
t
.
c
g
2*g
NUCLEAR REGULATORY COMMISSION
j
REGloN ill
j
g ,
- 'S
799 ROOSEVELT ROAD
- i.-
<,
GLEN ELLYN,ILLINolS 60137
.....
MAY10 '.28
Docket No. 50-346
Toledo Edison Company
ATTN:
Mr. James S. Grant
Vice President - Energy
Supply
Edison Plaza
300 Madison Avenue
Toledo, OH 43652
Gentlemen:
This refers to the inspection conducted by Mr. L. R. Greger of
this office on April 3-7, 1978, of activities at Davis-Besse Nuclear
Power Station, Unit 1 authorized by NRC License No. NPF-3 and to
the discussion of our findings with Mr. T. Murray and others of
your staff at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas
examined during the inspection. Within these areas, the
inspection consisted of a selective examination of procedures
and representative records, observations, and interviews with
personnel.
No items of noncompliance with NRC requirements were identified
during the course of this inspection.
In accordance with Section 2.790 of the NRC's " Rules of
Practice," Part 2, Title 10, Code of Federal Regulations, a
copy of this letter and the enclosed inspection report will
be placed in the NRC's Public Document Room, except as follows.
If this report contains information that you or your contractors
believe to be proprietary, you must apply in writing to this
office, within twenty days of. your receipt of this letter, to
withhold such information-from public disclosure. The
application must include a full statement of the reasons for
which the information is considered proprietary, and should be
prepared so that proprietary information identified in the
application is contained in an enclosure to the application.
O)
\\~
g g o g 0 50670
.
.
_ _ _
__
_ _ _ -
- p
=
y
,
l
.
,
l
O
Toledo Edison Company
-2-
MAY10 E78
We vill gladly discuss any questions you have concerning this
inspection.
Sincerely,
A. B. Davis, Chief
Fuel Facility and Materials
Safety Branch
Rnclosure: IE Inspection
Report No. 50-346/78-08
cc w/ enc 1:
T. Murray, Station
Superintandene
Central Files
Reproduction Unit NRC 20b
O
Local PDE
U. Young Park, Power
Siting Commission
.
..
-
'
<
1
1
l
l
-
'
RII M _
_
Oh
fb
RIIIg
__RIII _ ,
omce>
_..
'
g
Djvis -
Typb_U g__
r
sUnNAMED _,,G r _
k
F sher
om>
5/5/78
J///'/V