ML19329B481

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-346/77-33 on 771121-23. No Noncompliance Noted
ML19329B481
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 12/12/1977
From: Fisher W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Roe L
TOLEDO EDISON CO.
Shared Package
ML19329B482 List:
References
NUDOCS 8002050659
Download: ML19329B481 (2)


See also: IR 05000346/1977033

Text

.a

.

,

UNITED STATES

88099

NUCLEAR REGULATORY COMMtSSION

g

7

REGION til

a

.

o

3 "'

"j

799 ROOSEVELT RO Ao

occN ettym itusons sois7

DEC 121977

Docket No. 50-346

Toledo Edison Company

ATTN:

Mr. James S. Grant

Vice President - Energy

Supply

Edison Plaza

300 Madison Avenue

Toledo, OH 43652

Centlemen:

This refers to the inspection conducted by Mr. L. R. Greger of this

office on November 21-23, 1977, of activities at Davis-Besse Nuclear

Power Station, Unit 1, authorized by NRC Operating License No. NPF-3

and to the discussion of our findings with Mr. T. Murray at the con-

clusion of the inspection.

,_.

/

s

!

l

(j

The enclosed copy of our inspection report identifies areas examined

during the inspection. Within these areas, the inspection consisted

of a selective examination of procedures and representative records,

observations, and interviews with person ~ 1.

No items of noncompliance with NRC requirements were identified dur-

ing the course of this inspection.

Based on discussions with your representatives at the site, we under-

stand that in the event of an occurrence specified in Environmental

Technical Specification 5.4.2.A, you vill notify us within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />

by telephone, telegraph, or facsimile transmission in addition to

submitting the 10-day written report.

!

In accordance with Section 2.790 of the NRC's " Rules of Fractice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this

letter and the enclosed inspection report will be placed in the

NRC's Public Document Room, except as follows.

If this report

contains information that you or your contractors believe to be

proprietary, you must apply in writing to this of fice, within

8 0 02 0 @9,

-

.

.

.

.

-

,

n

f'"

P"

-

\\

i(d

.

DEC 121977

2-

Toreaa sdison company

-

a

-

-

1

t

l

.

twenty days of your receipt of this letter, to withhold such

infor: nation from public disclosure. The application must include

full statement of the reasons for which the information is con-

a

l

sidered proprietary, and should be prepared so that proprietary

infornation identified in the application is contained in an

-

.

enclosure tc the application.

,

.

I

tie vill gT uty discuss any questions you have concerning this

inspection.

Sincerely,

,

,

.

W. L. Fisher, Acting Chief

Fuel Facility and Materia?s

Safety Branch

-

Enclosure:

IE Inspection

, A

Koport No. 50-346/77-33

- (s )

. "J

cc v/ encl:

.

Central Files

i

J xeproduction Unit wac 20b

PDR

Local PDR

NSIC

TIC

l

U. Young Park, Power

Siting Comission

'

,

)

-

.. .. _. ..

'

.

.

r.

- -

.

..

,

4

}^

-

-

-

c;t

RIII

RIII

a r r.c c ,

RII,

__

_

_

_

,

euwa== *

. C rc.g.e.,r, _ k

Fisher

Tambling.__

12/8/77

(l.h

. , _ , , , _ , , , , _

ear a *

NRC FODI 313 (N6) NRCM 0240

W ut s. oovensu amt entanNo or recas isra -eas-eas