ML19329B467
| ML19329B467 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 06/15/1976 |
| From: | Jay Collins Office of Nuclear Reactor Regulation |
| To: | Stolz J Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8002050651 | |
| Download: ML19329B467 (2) | |
Text
L
.o
. hxkzi 0
?
y 151976 Docket
- o. S0-346, J. Stolz, Chief, Light Water Reactors Branch No.1, DPM ACCEPTANCE REVIEW OF THE APPENDIX I INFOR'iATION FOR DAVIS-BESSE, IRIIT NO.1 We have completed our acceptance review of the information provided by the applicant for Davis-Besse, Unit No.1, dated June 4,1976, to meet the requirements of Section V.3 of Appendix I to 10 CFR Part S0. The applicant has provided information that will permit evaluation of Section II.D under the Annex to Appendix I of 10 CFR Part S0. The Radiological Assessment and liydrology-Meteorology Branches find that the information provided is satisfactory for their evaluation; however, the Effluent Treatment Systens Branch requires additional 'nformation en containment purge data and release points. The questions are enclosed.
ORIGI!AL S!G:E3 37 JOHN T. COLLIIIS John T. Collins, Chief Effluent Treatrent Systems Franch Division of Site Safety and Environmental Analysis
Enclosure:
Acceptance Review questions cc:
R. DeYoung
't. Williams R. Vollmer L. Hulman W. Kreger G. Knighton E. Markee DISTRIBUTION P. Cota L. Engle Docket File S0-346 N. Burke NRR Reading F. Cardile DSE Reading ETSB Reading 8 0 02 0504Sl
[
DSE:ETSBh' DSE.:.E.TSB._.;g : E..T_SB....
DSE o,,,e s 7
.v.m s,
_ WBurke._
J Co11 ins.
FCardile:do 06/14/_76
_0_6//yf 76_
'06/4'/76 u r s.-
Taran AEC.313 sRev,9 53) AECM 0240 W u. s. novsnmesang ramvmo orrican sere.sae. nee
fi
~~
~
JUN 151976 ACCEPTANCE REVIEW QUESTIONS ON APPENDIX I ANALYSIS FOR DAVIS-BESSE NUCLEAR STATION, UNIT 1 Docket No.
50-346 1.
Item 6.3 of Table A6 indicates that there will be 4 purges per year at 50,000 cfm for 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> and ventilation for 504 hours0.00583 days <br />0.14 hours <br />8.333333e-4 weeks <br />1.91772e-4 months <br /> /yr at 50,000 cfm during refueling. Justify these parameters in light of the fact that NUREG-0017, Section 2.2.10, states that operating experience at plants similar to Davis-Besse indicates a need to vent the containment approximately 20 times per year during power operation.
2.
Do the release points indicated in Table A3 have deflectors or diffusers associated with them?
O e
9 O
B m
-