Forwards IE Insp Rept 50-346/77-29 on 770921-22. No Noncompliance Noted
ML19329B463
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 10/27/1977
From: Heishman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Roe L
TOLEDO EDISON CO.
Shared Package
ML19329B464 List:
References
NUDOCS 8002050649
Download: ML19329B463 (2)


See also: IR 05000346/1977029

Text

-

.

,

,

.

,

/

># R80g

UNITED STATES

f

'g

NUCLEAR REGULATORY COMMISSION

[

' f

799 8tOOSEVELT AO Ao

REGloN lli

o

e

[

GLEN ELLYN. ILLINOIS 60137

.....#

Docket No. 50-346

F

2'[1977

Toledo Edison Company

ATTN:

Mr. James S. Grant

Vice President - Energy

Supply

Edison Plaza

300 Madison Avenue

Toledo, OH 43652

Gentlemen:

This refers to the inspection conducted by Mr. R. J. Cook of this

office on September 21 and 22, 1977, of activities at Davis-Besse

Nuclear Power Station, Unit 1, authorized by NRC Operating License

No. NPF-3 and to the discussion of our findings with Mr. W. Green

at the conclusion of the inspection.

'O

The enclosed copy of our inspection report identifies areas

examined during the inspection. Within these areas, the

inspection consisted of a selective examination of procedures

and representative records, observations, and interviews with

personnel.

No items of noncompliance with NRC requirements were identified

during the course of this inspection.

In'accordance with'Section 2.790 of the NRC's " Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this

letter and the enclosed inspection report will be placed in the

NRC's Public Document Roem, except as follows.

If this report

contains information that you or your contractors believe to be

a

proprietary, you must apply in writing to this office, within

.

twenty days of your receipt of this letter, to withhold such

information from public disclosure. The application must include

a full statement of the reasons for which the information is con-

sidered proprietary, and should be prepared so that proprietary

information identified in the application is contained in an

enclosure to the application.

8o02oq0M7

,

,

_ _

..

r

~

.

.

O

'

C 271977

Toledo Edison Company

-2-

We will gladly discuss any questions you have eeneerning this

inspection.

Sinceraly,

R. F. Beishman, Chief

Esactor Construction and

Engineering Support Branch

Enclosures IE Inspection

Esport No. 50-346/77-29

e

,

ac w/ enc 1:

Central Files

Reproduction Unit HEC 20b

FDR

Iacal PDE

O

ESIC

T1C

U. Young Park, Power

siting Co= famion

,

I

s

f

i

!

!

1

-

i

.

N

i

i

i

ome ,

RIII

af

_ EIIL r ,

RIII tA

RIII

__

-

Cook /i h Ms

Heisbn

Tambli

4

.u . . .

.,,,j10/21/77

{

/bh6/D

,

l

i