/d UNITED STATES ATOMIC ENERGY COMMISSION OlVISION OF COMPLIANCE g,.,
,y REGION lli 799 ROOSEVELT ROAD TELEPHONE GLEN ELLYN. ILLINOls 60137 alz) ass.zaso February 28, 1972 Toledo Edison Co=pany Docket No. 50-346 ATT3:
- 'r. Glenn J. Sc pcon Vice President, Power 420 Xadi:en Avenue Toledo, Chio 43601 Contic=cn:
Uith reference to our letter of Februsry 3,1972, concerning the incpection perfor=cd on Janusry 11 - 12, 1972, we understood that you intended to ce=plete an investigation effort to deter =ine the cause of a series of low concrete strength test recults and that the investigation would include a review of the physical as well as the chc=ical aspects of concrete production. Wo also understood the re:ults of the investigation would be docu=cated. Subscquent to the incpection, our inspector indicated a need for a copy of the docu= nted results of the investigation. We request that you for-usrd this =sterial to this office at your earliest convenience.
Should you have questicas concerning this letter, we vill be glad to discuss the:2 with you.
Sincerely yours, Boyce H. Crier Regional Director cc:
L. E. Roe, Project Engineer bec:
J. B. Henderson, CO H. L. Wedsvorth, General L. 'Kornblith, C0 Superintendent R. H. Engelken, CO J. A. Lenardson, Qunlity P. A. Morris, DRL-Assurance Engineer C0 Files DR Central Files PDR Local PDR NSIC R. L. Shannon, DTIE m