UNITED STATES
?
);
i ATOMIC ENERGY COMMISSION i
DIVISION OF COMPLIAfJCE REGION lli
~
Ongs e 799 ROOSEVELT ROAD 7gggpgggg GLEN ELLYN, ILLINOls 60137 (312) ass.zeso March 9, 1972 Toledo Edison Company Docket No. 50-346 ATTN: Mr. Glenn J. Sampson Vice President, Power 420 Madison Avenue Toledo, Ohio 43601 Gentlemen:
This refers to the inspection conducted by Mr. 011er of this office on February 23 - 24, 1972, at the Dresser Industries plant, located in Alexandria, Louisiana, of activities related to construction of the Davis-Besse facility authorized by AIC Construction Permit No.
CFPR-80 and to the discussion of our findings at the conclusion of the inspection with Messrs. Richardson and Brown of the Dresser Industries staff.
The area awa=4nad during the inspection was the canufacture of main steam safety valves. Within this area, the inspection consisted of selective===fantion of procedures and representative records, interviews with plant personnel, and observations by the inspector.
No.tems of noncompliance with AEC requirements were identified i
within the areas aw-ined during this inspection.
No reply to this letter is necessary; however, should you have questions concerning this inspection we will be glad to discuss them with you.
Sincerely yours, Boyce H. Grier Regional Director cc:
L. E. Roe, Project Engineer bec:
J. B. Henderson, CO N. L. Wadsverth, General L. Kornblith, CO Supe'intendent R. H. Engelken, C0 J. A. Lanardson, Quality P. A. Morris, DRL Assurance Engineer CO Files DR Central Files PDR Local PDR i