Interim Deficiency Rept Re Ac Breaker Cabinet Seismic Qualifications.Cabinet Attachment to Floor Inadequate to Withstand SSE Acceleration Levels.Cabinet Mounting re-design Being Analyzed.Rept to Be Submitted on Completion of Study
ML19329B225
Person / Time
Site: Davis Besse, Oconee, Crystal River, Rancho Seco, Crane  Duke Energy icon.png
Issue date: 05/08/1975
From: Roe L
TOLEDO EDISON CO.
To:
Shared Package
ML19329B226 List:
References
NUDOCS 8001310575
Download: ML19329B225 (1)


Text

--

., ~

fr 2, fr E-TCLEDO b BOISui'd LOWELL E. ROE May 8, 1975 Sc'a*t.es Deveicornent Fac (4193 259-5242

~

Docket No. 50-346*

l Dr. Donald F. Knuth, Director Office of Inspection & Enforcement U.S. Nuclear Regulatory Commission

]

Washington, D.C.

20555

Dear Dr. Knuth:

i This letter is submitted as an Interim Report regarding the deficiency l

in the seismic qualification of the control rod drive control system AC l

trip breaker cabinets for the Davis-Besse Nuclear Power Station Unit 1.

As previously discussed with Mr. J. Sutton, NRC-DRO Region III inspector, i

the matter is viewed as a significant deficiency pursuant to 10CFR550.55(e).

A reevaluatien of the ceimic ge:,lificeren of the AC hren'm enhimon has found that the attachment of(the cab nets to the floor is inadequate to withstand the SSE acceleration levels. An analysis is presently i

being undertaken to redesign the mounting of the cabinets.

.~

A definitive report of the deficiency, analysis of the salety implications, i

and the corrective action taken will be submitted to your office in accordance with 10CFR550.55(e) upon completion of our study of this problem.

Yours very truly,

[

mj c/6 cc:

J. G. Keppler, Regional Director Office of Inspection and Enforcement Region III 8001310 7 7[