ML19329B198

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-346/70-02 on 700610-11.No Noncompliance Noted
ML19329B198
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 07/14/1970
From: Henderson J
US ATOMIC ENERGY COMMISSION (AEC)
To: James O'Reilly
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML19329B199 List:
References
NUDOCS 8001310551
Download: ML19329B198 (1)


Text

_

e 1

=

JUL 141970 J. F. O'Reilly, Chief. Reactor Inspection and Enforcement Branch Division of compliance TCLIDO IDISON CGEpAME (D&VIS-BESSE) - DOCERT NO. 50-346 The enclosed report of the initial % inspection of the subject facility is transmitted for information. Compliance found that the applicant has developed and placed in effect a quality assurance program which conforms to Appendix B to 10 CFR 50. and the coursituents in the application.

Presamt manning is minimal, although apparently adequate for the current status of the project. Additional personnel are to be assigned on what appears to be a realistic schedule. Compliance will====in= this subject during the continuing inspection program.

J. 3. Henderson Senior Construction Engineer Division of Coupliance Enclosure CO Ept No. 346/70-2 cc w/snelosure:

I. G. Case. DRS (3)

F. A6 Norris. DEL R. S. Boyd. DEL (2)

R. C. DeYoung. DEL (2)

D. J. Skovbolt. DEL (3)

F. W. Howe. DEL (2)

L. Eorablith. Jr., CO R. W. Kirkman, CO I l

J. G. Davis. CO II l

B. E. Crier. C0:III D. I. Walker. CO IY R. W. Smith. CO V EEG Files W. E. vetter. Co:III omer>....C0 5

.C 0...h.......C 0

_ _. Jo n.

e.mamat....aum...d

.7/13.0..

3/13/70

.7/13/70..Y mre.

Form AEC-318 (Rev. 9-53)

U.s. GOVERN M PRmTmG OmE s t NS-0-364-kee 8001 aiorg/ p

.