ML19329B134

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-346/76-15 on 760712-16 & 20-21. No Noncompliance Noted
ML19329B134
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 08/02/1976
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Roe L
TOLEDO EDISON CO.
Shared Package
ML19329B136 List:
References
NUDOCS 8001300711
Download: ML19329B134 (2)


See also: IR 05000346/1976015

Text

_ _ __

_

_ _ ___._

---

_

_

__

..

. .

..

.-

-

. . . - _ _

.

IEF1LE COPX

UNITED STATES

.

NUCLEAR REGULATORY COMMISSION

REGION lli

799 ROOSEVELT ROAO

GLEN ELLYN, ILLINOIS 60137

AUG

2 1976

Toledo Edison Company

Dockat No. 50-346

ATTN: Mr. Lowell Roe

Vice President

Facilities Development

Edison Plaza

300 W Af=an Avenue

d

Toledo, Ohio

43652

Gentlement

This refers to the inspection conducted by Messrs. T. L. Harpster

and R. D. Martin of this office on July 12-16 and 20-21, 1976,

I

of activities at Davis Besse Unit 1 Construction Site authorized

by NRC Construction Permit No. CPPK-80 and to the discussion of our

fiad4=== with you at the conclusion of the inspection.

Os

The enclossd copy of our inspection report identifies areas

- 4nad during the inspection. Within these areas, the

inspection consisted of a selective ar==4 nation of procedures

and representative records, observations, and interviews with

personnel.

No items of noncompliance with NRC requirements were identified

,

during the course of this inspection.

In accordance with Section 2.790 of the NRC's " Rules of

Practice," Part 2, Title in, Code of Federal Regulations, a

copy of this letter and the anelased inspection report will

be placed in the NRC's Public Doct===nt Room, except as follows.

If this report contains information that you or your contractors

believe to be proprietary, you must apply in writing to this

office, within twenty days of your receipt of this letter, to

withhold such information from public disclosure. The

application must include a full statement of the reasons for

$*

  • e

(D)i

80013007//

k

"'8 *

_

-

. _

.

_ _ _ _ _ - _ _ _ _ _ _ _ _

____

_ _ _ _ _ _ _ _ _ _

.

.

,

_

'

.

,

-

.

Toledo Edison Company

-2-

gyg

g jg7g

.

which the information is considered proprietary, and should be

prepared so that proprietary information identified in the

app 14a=*4an is con =4nad in an enclosure to the application.

e

l

We will gladly discuss any questions you have concerning this

inspection.

Sincerely yours,

c

Caston Fiore111, Chief

Raactor Operations and

l

Nuclear Support Branch

Enclosure:

IE Inspection Report

i

No. 050-346/76-15

bec w/ enc 1:

Central Files

Reproduction Unit NRC 20b

PDR

Local PDR

NSIC

TIC

U. Young Park, Power

Siting Commission

O