ML19329B079
| ML19329B079 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 11/11/1976 |
| From: | Heishman R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Roe L TOLEDO EDISON CO. |
| Shared Package | |
| ML19329B081 | List: |
| References | |
| NUDOCS 8001300672 | |
| Download: ML19329B079 (1) | |
Text
,_
M}g UNITED STATES NUCLEAR REGULATORY COMMISSIO'l D
REGION lli 799 ROOSEVELT RO AO CLEN ELLYN, ILLINOIS 60137 NOV 111976 The Tolade Edison Compeury Docket !ae. 5(>-346 Azu: Mr. Lovell z. aos Vice Pr==4d==*
y==414e<== Developmeng Mi=an Plaza 300 Medimes Avenne Toledo, Ohio 43652 c
c==e1=====
Thanis yes for your final reporta pursuant to 10 CFR Part 50.55(e):
(1) Report darad cetober 19, 1976, relative to Cewaral Electria Campany type AK 480velt AC circuit breakers; (2) report dated cetober 26, 1976, relative to the emergency diesel generator jacket cooling water heat
-h==q=es; and (3) report dated October 27, 1976, relative to Westing-house type D11F 4.16 KY seitchgear. W will review these estters darias a future 4 7 P =:
Tour report dated Getsber 27, 1976, and the refereacti ine=via report dated Detober 25, 1976, sensernias remator coolant p my seal iM eetica 4==1=e4== valve OsmT643) have been rese1ved and resiswed. Further infow==*4n=, as respaired by 10 CTR Part 50.55(e)(3) relative to the cause of the failure and the safety i==Ma=tions, is a=e====wy.
We understand, based se discussians by our +==p-ators with site per-soonel, that the yoke for valve 15I37663 has f=11=d twice, and thfa inf p ei== should be in=1= dad in your report as part of the evaluatfma.
Your cooperaties with us is appresisted.
Sine =valy yours, R, 7. n=4=h==n, Chief Haastor Construction and Engfasering Support Branch cc:
Dr. Ernst Volgenen bec w/ltrs dtd 10/19, 25, 26, Director of Inspection and 27/76:
and Enforcement Central Files Reproduction Unit NRC 20b PDR Local PDR 8 0 0130 0[7R
<l,@ $
t, U. Young Park, Power
$ h W} [ l 9
Siting Commission f
\\
%g.d
.