Forwards Request for OL Amend & Related Safety Evaluation Revising Tech Spec Table 3.2-1, DNB Margin Reactor Coolant Flow Rates to Accommodate DNBR Penalty Per OL Condition
ML19329B052
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 04/10/1978
From: Roe L
TOLEDO EDISON CO.
To: Boyd R
Office of Nuclear Reactor Regulation
Shared Package
ML19329B053 List:
References
426, NUDOCS 8001300651
Download: ML19329B052 (5)


Text

8

/ ,

- REGULATORY INFORMATION DISTRICUTION SYSTEM (RIDS) 50-346 CISTRIEUTION FOR INCOMING MATERIAL DOCDATE: 04/10/79 REC: 20YD R S CRO: ROE L E DATE RCVD: 04/10/~C-TCLEDO EDISON NRC COPIEE RECEIVED DCCTYPE: LETTER NOTARIZED: NO LTR 1 ENCL 1

SUBJECT:

APPENDIX A TECH SPECS FROPOSED CHANGE FORUARDINO LIC NO NFF-3 AFFL FCR AMEND:

CONCERNINO FEVISION TO TACLE 3.2-1 "DNS MARGIN" REACTCR COCLANT RATES. W/ATT SAFETY EVALUATION AND ENCLS.

REVIEWER INI T I AL: XJM LANT NAME: DAVIS GESSE - UNIT 1 DISTRIBUTOR INITIAL: g

+ + 4-*44 4-*444 44 4 4 4 4 DISTRI2UTION OF THIS MATERIAL IS AS FOLLOWS +44444+444444 NOTES:

SEND ALL AMENCMENTS TO J. ROE 1.

OENEPAL DISTRIEUTION FCR AFTER IS'EUANCE OF OPERATING LICENSE.

(DISTRIEUTION CODE A001.

FOR ACTION: ER C '" ' .. .Z44W/7 ENCL F; _ L NRC PDR**W/ ENCL INTERNAL: REG FILE 4*' OELD**LTR ONLY a . . _ c a_. L C HEC K4->W/ ENCL HANAUER HW/ ENCL SHAO MW./ ENCL EISENHUT**W/ ENCL EUTLER4*W.' ENCL 2AERfdW/ ENCL J COLLINS **W./ ENCL ORIMESRwW/CNCL J. f*CGOUGH49W/ ENCL EXTERNAL: LPDR'S P T. CLINTON, OH+4W/ ENCL .

TIC 4*W/ ENCL W_.ICw W/ ENCL ACRS CAT B44W/ts ENCL b b -

LTR 40 ENCL 39 CONTROL NER: W ,1 ? /

DISTRI5UTION:

SIZE: 2F+1F+2P +.

  • * * * -+ w e *
  • wo o *
  • u + o
  • **m
  • nmuno*oo **
  • m *m THE END m ,.

L 8001300[I

~ gmn y-~1 m n;n-

. i c u u n i L .1 ! u J . D tiL L Ae q . ltr H)LEDO EDISON LOWELL E. RCE Docket No. 50-346 l',,C'j'",',o.....

- mm asp 3a2 Operating License NPF-3 7 April 10, 1978 --

Serial No. 426 d[ ,

y __e b

.i _?. _.-

u __

Director of Nuclear Reactor Regulation Attention: Mr. Roger S. Boyd, Director Division of Project Management Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, D. C. 20555

Dear Mr. Boyd:

Enclosed please find a request for an Operating L. cense amendment and its associated safety evaluation to change the Davis-Berse Nuclear Power Station Unit 1 Technical Specifications. The change to the Table 3.2-1 "DNB Margin" Reactor Coolant Flow Rates is being requested to accommodate the DNBR penalty as delineated in the Davis-Besse Unit 1 Operating License NPF-3, condition 2C.3.(1), Rod Bow Penalty.

Toledo Edison considers this request for any Operating License Amendment to be exempt from the License Fees under provisions of Footnote 2 under the " SCHEDULE OF AMENDMENT FEES FOR REACTOR FACILITY PERMITS, LICENSES, AND OTHER APPROVALS REQUIRED BY THE LICENSE OR COMMISSION REGULATIONS" given in Section 170.22, P. 7220 of Federal Register dated February 21, 1978.

This technical specification change is being requested on an emergency basis since the one hundred (100) effective full power days specified in licensed condition 2C.3.(1) is expected to occur on May 16, 1978.

Further, this emergency request results from your lack of attention to our October 4,1977 letter (Serial Number 388) which requested your early review of the B&W rod bow model. We had also previously urged your review of this model prior to the issuance of our Operating License.

\

W \

THE TCLECO EDISON CCMPANY EDISCN PLAZA 300 MADISCN AVENUE TCLECO, CHIO 43652 l

l

i 2--

1 Toledo Edison considers the information included in the attached safety evaluation as a sufficient and satisfactory response to Operating

, Licensed condition 2C.3.(i). We request your prompt action on this matter.

Yours very truly, Attachments jh c/06 4

0 k

i 4 1 0

I l

i I

4 1

i

i.

DB-1 REQUESTED CHANGE TO THE DAVIS-BESSE NUCLEAR POWER STATION UNIT NO. 1 TECHNICAL SPECIFICATIONS (Appendix A to License No. NPF-3)

. The attached Table 3.2-1 has been modified to show higher reactor coolant flow rates which the system can provide with margin and which will accom-modate the DNBR penalty associated with Rod Bow as required by operating license condition 2C.3.(i). ,

I

. . , - , ,, , . . , ~ . ... ,- --.----,-.,r.- ,

f TABLE 3.2-1 )

g .

5 DNB MARGIN P -

M LIMITS M '

!" - Four Reactor Three Reactor One Reactor e Coolant Pumps Coolant Pumps Coolant Pump 5 Parameter Operating Operating Operating in Each Loop Reactor Coolant Hot Leg < 611.1 < 611.1(1) < 611.1 Temperature T F H ,

> 2058.7 III

~

ReactorCoolantPressure,psig.I2) > 2062.7 > 2091.4 Reactor Coolant Flow Rate, gpm 7 369,600 2 276,900 2 182,300 R.

7

~

+

UI Applicable to the loop with 2 Reactor Coolant Pumps Operating.

(2} Limit not applicable during either a TilERMAL POWER ramp increase in excess of 5% of RATED TilERMAL POWER per minute or a TilERMAL POWER step increase of greater than 10%

of RATED TilERMAL POWER.

I I i