ML19317F579

From kanterella
Jump to navigation Jump to search
Requests NRC Schedule for Completion of Review of B&W Proposed Rod Bow Model to Enable Util to Meet Facility OL Conditions W/O Imposing Load Restrictions
ML19317F579
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 10/04/1977
From: Roe L
TOLEDO EDISON CO.
To: Stolz J
Office of Nuclear Reactor Regulation
References
388, NUDOCS 8001150900
Download: ML19317F579 (2)


Text

__

DISTRIBUTION AITER ISSUAT ' 0F OPERATriG L.*2NSE u.s.Nucts an r.acuLAfemy c=un.. A AN OCC T NuM8ER l

NRCror.u ;S5 d-J l

l12 731 NRC OISTRIBUTION som PART 50 COCKET NJERIAL l

i FRCM:

=Artcp cccuuaNT Tc:

Toledo Edison Ccmpany 10/4/77 i

Toledo, Ohio

Ara asesivso Mr. Johm F. Stol:

10/7/77 Lcwell E. Roe I

, M-un C:NCT=MlZIQ PRCP IN#u'T PCMM NuMSER CP COP'as MsCslVIC h== air:N AL l

i s.,9 a e6 NCLAgggpsgg v

sucLarsas

. :sser;ipucN.

Requesting status of" Nuc. Reg's revicw cf the Babcock & Wilcox Ccmpanier, propcsed rod bow model........

l i

J

?LANT NXE: Davis-3 esse 1

1 RJL 10/7/,77 (1-P) j i

S AF"I""f FOR ACCN/INFORMATICN i

1 3PriCH CHTEF! (7) i S 78 t.,Z.

I I I

6 l l i

i !

l l t l

1 I

i t t

l l

l

,i i

6 t 7 3

INTERNAL CISTRIEUTICN

&~

i 1 1 6 1 1

! (w M DR I i

1 I I i

i I C E (2)

I I I

t t t I I CELD i l i 6 e i i

I :4ANAUER I I

! I i

l l

. CHECK i i i i t

6 i

6 M i i I i I

6 l

i I!SE' GUT t i i t i

i l i SEW I I t i t

i i

i i SAER I 6 l l l

}

l i i SUTLIR I l l

l l

l t

l l t GRIES l l l l l

t i

IJ. COLLINS 1 1 I t i i 1

J.

McGCOG4 I i i i l i I t i

l l I i i i

l i i i t t l

l I I i i l i I I t

I i 1 6 I i i i I

l l 6 6 I l I i I i

I EXTERNAL CITTRIBUTICN i

CONTR Ct. NUMBE R I

i t'?tR: MrT f E,il &J4d AJ d be.

I i l I T'C al i I

~

l i I i 'ISIC i l i I N

1 116 CTS ACRS SENT CATEDORY Q.

I l j

i i I ;

t i O

~

150

~

<~"

TOLEDO Docket 50-346 EDISON Serial Number 388 LOWELL E. ROE v.c. p m...n.

October 4, 1977

' =c += o===

  • 14191 259-5242 Director of Nuclear Reactor Regulation E77 Attention: Mr. John F. Stolz, Chief 3

Light Water Reactors Branch No. 1 3

u Division of Project Management United States Nuclear Regulatory Commission Washington, D.C.

20555

Dear Mr. Stolz:

This letter is to request the current status of your review of the Babcock & Wilcox Company proposed rod bow model which was submitted to the NRC in a letter from K. E. Suhrke to D. F. Ross dated September 10, 1976, and to urge that the NRC review continue in as expedient a manner as is possible. We had been anticipating resolution of this matter by the end of last July based on discussions between our Mr. E. C. Novak and your Mr. D. F. Ross on June 28, 1977.

Item 2.C. (3)(1) of Facility Operating License Number NPF-3 for the Davis-Besse Nuclear Power Station Unit No. I will require that the facility Technical Specifications be revised to reflect a DNBR penalty upon completion of 100 effective full power days of operation if the B&W proposed rod bow model has not been approved by the Commission.

These DNBR penalties may result in significant power prcduction restrictions which could be obviated by resolution of the B&W rod bow model.

It should be noted that some time must be allowed for implementation of the model, even after approval, to allow for penalty calculations, Technical Specification revision submictal and approval, and facility operating procedure modifications. The 100 effective full power days could be reached as early as January 1978 which makes the resolution of this model imminently necessary.

May we please have your prompt response regarding the NRC schedule for completion of its review of B&W 's rod bow model so that Toledo Edison can make the necessary commitments to meet its Davis-Besse Unit 1 Facility Operating License conditions without imposing load restrictions.

Yours very truly, wp c/6 THE TCLECO EOISCN COMPANY EDISCN PLAZA 300 MADISCN AVENUE TOLEDO, CHIO.23652

,