ML19329B025

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-346/74-06 on 740903-04.No Noncompliance Noted
ML19329B025
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 09/24/1974
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Roe L
TOLEDO EDISON CO.
Shared Package
ML19329B026 List:
References
NUDOCS 8001290739
Download: ML19329B025 (2)


See also: IR 05000346/1974006

Text

_ - - - _ _

Y'~~<.A_Cj'

'

,

,

.-

,

f

U NITED STATES

'

q!Q~.]-

ATOMIC ENERGY COMMISSION

,, /

OIRECTORATE OF REGULATORY OPERATIONS

REGION lli

Nis @ p

799 ROOSEVELT ROAD

-

TELEPHONE

g .

,

GLEN ELLYN, ILLINOIS Go137

(312) 858-2660

SEP 2 4 10 4

.

Toledo Edison Company

Docket No. 50-346

ATTN:

Mr. Lowell E. Roe

Vice President, Power

Edison Plaza

300 Madison Avenue

Toledo, Ohio 43652

-

Gentlemen:

.

This refers to the inspection conducted by Messrs. R. Knop and R. Martin

of this office on September 3 and 4, 1974, of activities at Davis-Besse

Unit 1 Construction Site authorized by AEC Construction Permit CPPR-80

and to the discussion of our findings with Mr. J. Evans and others of

your staff at the conclusion of the inspection.

A copy of our report of this inspection is enclosed and identifies the

areas examined during the inspection. Within these areas, the inspection

g

I

consisted of a selective examination of procedures and representative

.

records, interviews with plant personnel, and observations by the inspectors.

No violations of AEC requirements were identified within the scope of this

inspection.

In accordance with Section 2.790 of the AEC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the-

enclosed inspection report will be placed in the AEC's Public Document Room.

If this report contains any information that you or your contractors believe

to be proprietary, it is necessary that you make a written application to

this office, within twenty days of your receipt of this letter, to withhold

such information from public disclosure. Any such application must include

a full statement of the reasons for which it is claimed that the information

is proprietary, and should be prepared so the proprietary information

identified in the application is contained in a separate part of the docu-

ment. Unless we receive an application to withhold information or are

.

otherwise contacted within the specified tiine period, the written material

-

identified in this paragraph will be placed in the Public Document Room.

.

%.J

so o12,o

37

-

.

4

-- - -,,, .

_ _

. .

.. .-

.

,

4

BEE 2 4 1974

2-

Toledo Edison Company

-

,

4

'

Should you have any questions concerning this inspection, we will be glad

to discuss them with you.

Sincerely yours,

.

.

.

.

.

,

' James.G. Koppler

~

Regional Director

Enclosure:

RO Inspection Rpt No. 050-346/74-06

hec: RO Chief, FS&EB

RO:HQ (4)

Licensing (4)

DR Central Files

.

RO Files

.

PDR

Local PDR

,

'

NSIC

TIC

,

l

l

l

l

l

.

.

O

t

- -

--

-

- - - - ,

..m

s

--

,

,- ,

,--,-,,---.--_,,-,,_.-_-n_---

.,,,- - -

- -