ML19329B025
| ML19329B025 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 09/24/1974 |
| From: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Roe L TOLEDO EDISON CO. |
| Shared Package | |
| ML19329B026 | List: |
| References | |
| NUDOCS 8001290739 | |
| Download: ML19329B025 (2) | |
See also: IR 05000346/1974006
Text
_ - - - _ _
Y'~~<.A_Cj'
'
,
,
.-
,
f
U NITED STATES
'
q!Q~.]-
ATOMIC ENERGY COMMISSION
,, /
OIRECTORATE OF REGULATORY OPERATIONS
REGION lli
Nis @ p
799 ROOSEVELT ROAD
-
TELEPHONE
g .
,
GLEN ELLYN, ILLINOIS Go137
(312) 858-2660
SEP 2 4 10 4
.
Toledo Edison Company
Docket No. 50-346
ATTN:
Mr. Lowell E. Roe
Vice President, Power
Edison Plaza
300 Madison Avenue
Toledo, Ohio 43652
-
Gentlemen:
.
This refers to the inspection conducted by Messrs. R. Knop and R. Martin
of this office on September 3 and 4, 1974, of activities at Davis-Besse
Unit 1 Construction Site authorized by AEC Construction Permit CPPR-80
and to the discussion of our findings with Mr. J. Evans and others of
your staff at the conclusion of the inspection.
A copy of our report of this inspection is enclosed and identifies the
areas examined during the inspection. Within these areas, the inspection
g
I
consisted of a selective examination of procedures and representative
.
records, interviews with plant personnel, and observations by the inspectors.
No violations of AEC requirements were identified within the scope of this
inspection.
In accordance with Section 2.790 of the AEC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the-
enclosed inspection report will be placed in the AEC's Public Document Room.
If this report contains any information that you or your contractors believe
to be proprietary, it is necessary that you make a written application to
this office, within twenty days of your receipt of this letter, to withhold
such information from public disclosure. Any such application must include
a full statement of the reasons for which it is claimed that the information
is proprietary, and should be prepared so the proprietary information
identified in the application is contained in a separate part of the docu-
ment. Unless we receive an application to withhold information or are
.
otherwise contacted within the specified tiine period, the written material
-
identified in this paragraph will be placed in the Public Document Room.
.
%.J
so o12,o
37
-
.
4
-- - -,,, .
_ _
. .
.. .-
.
,
4
BEE 2 4 1974
2-
Toledo Edison Company
-
,
4
'
Should you have any questions concerning this inspection, we will be glad
to discuss them with you.
Sincerely yours,
.
.
.
.
.
,
' James.G. Koppler
~
Regional Director
Enclosure:
RO Inspection Rpt No. 050-346/74-06
hec: RO Chief, FS&EB
RO:HQ (4)
Licensing (4)
DR Central Files
.
RO Files
.
Local PDR
,
'
,
l
l
l
l
l
.
.
O
t
- -
--
-
- - - - ,
..m
s
--
,
,- ,
,--,-,,---.--_,,-,,_.-_-n_---
.,,,- - -
- -