ML19329B017
| ML19329B017 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 12/05/1974 |
| From: | Hunnicutt D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Roe L TOLEDO EDISON CO. |
| Shared Package | |
| ML19329B019 | List: |
| References | |
| NUDOCS 8001290736 | |
| Download: ML19329B017 (2) | |
See also: IR 05000346/1974008
Text
%ww
,.
'
'
p.tsc,r c ,o
,o
UNITCD STATCS
!
ATOMIC ENERGY COMMISSION
(m
.
k
DIRECTORATE OF REGULATORY OPERATIONS
(/j ,,'o ,1^ g/g
\\/
REGION lil
~
N
5 Oi
799 ROOSEVELT ROAD
-
ygtspoong
GLEN CLLYN, ILLINOIS 6o137
0 12)856 2660
5 1974
. ~
Toledo Edison Company
Docket No. 50-346
ATTN:
Mr. Lowell E. Roe
Vice President, Power
Edison Pla=a
300 Madison Avenue
Toledo, Ohio
43652
-
Gentlemen:
-
This refers to the inspection -conducted by Messrs. Greger and Jorgensen
of this office on November 5 and 6, 1974, of activities at the Davis
Besse Nuclear Power Station, Unit 1 authorized by AEC Construction
Permit No. CPPR-80 and to the discussion held with Mr. Evans and other
members of your staff at the conclusion of the inspection.
A copy of our report of this inspection is enclosed and identifies the
F
-
}
areas examined during the inspection. 'Within these areas, the inspection
/
consisted of a selective examination of procedures and representative
records _, interviews with plant personnel, and observations by the inspectors.
No violations of AEC requirements were identified within the scope of
this inspection.
-
In accordance with Section 2.790 of the AEC's " Rules of Practice," Part
2, Title 10, Code of Federal Regulations, a copy of this letter and the
enclosed inspection report will be placed in the AEC's Public Document
Room.
If this report contains any information that you or your con-
tractors believe to be proprietary, it is necessary that you make a
written application to this office, within twenty days of your receipt
of this letter, to withhold such information from public disclosure,
j
Any such application must include a full statement of the reasons for
which it is claimed that the information.is proprietary, and should be
prepared so the proprietary information identified in the application is
contained in a separate part of the document. Unless we receive an
application to uithhold information or are otherwise contacted within.
the specified time period, the written material identified in this
paragraph will be placed in the Public Document Room.
-
.
.
!
O'G
tj b
'2 f
h szm IO: FDR
'
use~ ~8 0 012 $ 0 73C
i
-
nc_
!
-
-
-
.
-Q
l
. . .
.
.
.
_-_
-
.-
.
.-
.
.
-
J
-
DEC,
t
-4
2-
Toledo Edison Company
-
.
,
No reply to this letter is necessary; however, should you have any
questions concerning this inspection, we vill be glad to discuss them
with you.
Sincerely yours,
D. M. Hunnicutt, Chief
Construction and Engineering
Support Branch
-
Enclosure:
4
RO Inspection Report
'
,
'
No. 050-346/74-08
8*
bec: R0 Chief, fS&EB
-
RO:HQ (4)
RO Files
-Licensing (4)
DR Central Files
'
-
.
Local PDR
-
~
,
,
-
.
9
%
e
,
-
,
s.
__
. - , ' - - -