Forwards Insp Rept 50-346/74-10 on 741120-23.No Noncompliance Noted
ML19329B009
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 01/07/1975
From: Hunnicutt D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Roe L
TOLEDO EDISON CO.
Shared Package
ML19329B010 List:
References
NUDOCS 8001290730
Download: ML19329B009 (2)


See also: IR 05000346/1974010

Text

.

-

-.

'

.

-

.

$*G' eq

g~

p

i

UNITED STATES

(

)I I

eQ.

ATOMIC ENERGY COMMISSION

,

(/ 1, ,

yJ

DIRECTORATE OF REGULATORY OPERATIQNS

REGION 111

o

.

'" O'

799 ROOSEVELT ROAD

mg

GLEN ELLYN. ILLINOIS Go137

(312) 858-2460

l

JAN

7 1975

-

.

Toledo Edison Company

Docket No. 50-346

ATTN:

Mr. Lowell E. Roe

Vice President, Power

Edison Plaza

300 Madison Avenue

Toledo, Ohio

43652

Gentlemen:

This refers to the inspection conducted by Messrs. Sutton, Naidu and

Jablonski of this office on November 20-23, 1974, of activities at the

Davis-Besse Construction site authorized by AEC Construction Permit No.

CPPR-80 and to the discussion of our findings with you and Messrs.

Novak, and Lenardson and others of your staff at the conclusion of the

inspection.

A copy of our report of this inspection is enclosed and identifies the

areas examined during the inspection. Within these areas, the inspection

consisted of a selective examination of procedures and representative

records, interviews with plant personnel, and observations by the inspectors.

No violations of AEC requirements were identified within the scope of

this inspection.

In accordance with Section 2.790 of the AEC's " Rules of Practice," Part

2, Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the AEC's Public Document

Room.

If this report contains any information that you or your contractors

believe to be proprietary, it is necessary that you make a written

application to this office, within twenty days of your receipt of this

letter, to withhold such information from public disclosure.

Any such

application must include a full statement of the reasons for which it is

claimed that the information is proprietary, and should be prepared so

the proprietary information identified in the application is contained

in a separate part of the document.

Unless we receive an application to

withhold information or are otherwise contacted within the specified

time period, the written material identified in this paragraph will be

placed in the Public Document Room.

('h

t

)

1

v'

'

80012$0 730

9. -

. _ - .

_

_

-

-

-

. - _ _

..

.. . - _ _ .. _ _ -

_ -

-- _

.

.

JAN

7 1975

.

Toledo Edison Company

-2-

,

.

-

No reply to this letter is necessary; however, should you have any

questions concerning this inspection, we will be glad to discuss them

with you.

.

Sincerely yours,

.

j

D. M. Hunnicutt, Chief

Construction and Engineering

Support Branch

.

_

Enclosure:

RO Inspection Rpt. No.

050-346/74-10

.

.

bec: R0 Chief, FS&EB

RO: LIQ (4)

Licensing (4)

-

DR Central Files