| ML19329B009 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 01/07/1975 |
| From: | Hunnicutt D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Roe L TOLEDO EDISON CO. |
| Shared Package | |
| ML19329B010 | List: |
| References | |
| NUDOCS 8001290730 | |
| Download: ML19329B009 (2) | |
See also: IR 05000346/1974010
Text
.
-
-.
'
.
-
.
$*G' eq
g~
p
i
UNITED STATES
(
)I I
eQ.
ATOMIC ENERGY COMMISSION
,
(/ 1, ,
yJ
DIRECTORATE OF REGULATORY OPERATIQNS
REGION 111
o
.
'" O'
799 ROOSEVELT ROAD
mg
GLEN ELLYN. ILLINOIS Go137
(312) 858-2460
l
JAN
7 1975
-
.
Toledo Edison Company
Docket No. 50-346
ATTN:
Mr. Lowell E. Roe
Vice President, Power
Edison Plaza
300 Madison Avenue
Toledo, Ohio
43652
Gentlemen:
This refers to the inspection conducted by Messrs. Sutton, Naidu and
Jablonski of this office on November 20-23, 1974, of activities at the
Davis-Besse Construction site authorized by AEC Construction Permit No.
CPPR-80 and to the discussion of our findings with you and Messrs.
Novak, and Lenardson and others of your staff at the conclusion of the
inspection.
A copy of our report of this inspection is enclosed and identifies the
areas examined during the inspection. Within these areas, the inspection
consisted of a selective examination of procedures and representative
records, interviews with plant personnel, and observations by the inspectors.
No violations of AEC requirements were identified within the scope of
this inspection.
In accordance with Section 2.790 of the AEC's " Rules of Practice," Part
2, Title 10, Code of Federal Regulations, a copy of this letter and the
enclosed inspection report will be placed in the AEC's Public Document
Room.
If this report contains any information that you or your contractors
believe to be proprietary, it is necessary that you make a written
application to this office, within twenty days of your receipt of this
letter, to withhold such information from public disclosure.
Any such
application must include a full statement of the reasons for which it is
claimed that the information is proprietary, and should be prepared so
the proprietary information identified in the application is contained
in a separate part of the document.
Unless we receive an application to
withhold information or are otherwise contacted within the specified
time period, the written material identified in this paragraph will be
placed in the Public Document Room.
('h
t
)
1
v'
'
80012$0 730
9. -
. _ - .
_
_
-
-
-
. - _ _
..
.. . - _ _ .. _ _ -
_ -
-- _
.
.
JAN
7 1975
.
Toledo Edison Company
-2-
,
.
-
No reply to this letter is necessary; however, should you have any
questions concerning this inspection, we will be glad to discuss them
with you.
.
Sincerely yours,
.
j
D. M. Hunnicutt, Chief
Construction and Engineering
Support Branch
.
_
Enclosure:
RO Inspection Rpt. No.
050-346/74-10
.
.
bec: R0 Chief, FS&EB
RO: LIQ (4)
Licensing (4)
-
DR Central Files
RO Files
YDR
Local PDR
,