ML19329A965
Jump to navigation
Jump to search
| ML19329A965 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 08/07/1978 |
| From: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | |
| Shared Package | |
| ML19329A944 | List: |
| References | |
| 50-346-78-18, NUDOCS 8001270235 | |
| Download: ML19329A965 (1) | |
Text
_. __
I O
O 1
Appendix A NOTICE OF VIOLATION Toledo Edison Company Docket No. 50-346 Based on the inspection conducted on July 17-21, 1978, it appears that certain of your activities were in noncompliance with NRC requirements, as noted below. The item is an infraction.
Contrary to 10 CFR 50.59(b), reactor operation with monitor RE 1003 (condenser vacuum pump discharge) inopera'ule since midyear 1977 was not evaluated to determine whether the change from the FSAR described
{
operation involved an unreviewed safety question.
I
)
i 1
e e
O 8001270 h 4
, _.