ML19329A925
| ML19329A925 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 03/10/1975 |
| From: | Schwencer A Office of Nuclear Reactor Regulation |
| To: | Roe L TOLEDO EDISON CO. |
| References | |
| NUDOCS 8001150822 | |
| Download: ML19329A925 (2) | |
Text
.
b DISTRIBUTION w/o encls.
4
\\
NRC PDR L PDF Docket Files w/encls. [
LWR 2-3 Rdg Docket No. 50-346 MR 10 E';
LWR ads FSchroeder AKenneke LWR TCs ELD The Toledo Edison Company IE (3)
ATTN:
Mr. Lowell E. Roe LEngle Vice President, Facilities AGiambusso Development EGoulbourne 300 Edison Plaza WHouston w/encls.(IS&EP)
Toledo, Ohio 43652 HThornburg w/encls. (OIE)
ACRS (16) w/encls. (1)
As a result of our review of the Industrial Security Plan for the Davis Besse Nuclear Power Station, Unit 1, we are submitting the following NRC staf f positions and requests for additional information. The positions are listed in Enclosure 1.
We request that you state your intent regarding compliance with each of these positions and amend your Industrial Security Plan accordingly.
We have requested in Enclosure 2 additional information needed to clarify and amplify previously submitted information.
In order to maintain our licensing review schedule for those matters dealt with in the enclosures, we will need adequate responses by April 11, 1375 to all staf f positions and requests for information. The responses should be provided in the fom of page changes to your Industrial Security Plan (four copies required). Identify on the submitted pages, with a marginal mark and revision nu=ber, those portions of the text which have been revised.
Please inforn us within seven days after receipt of thic letter of your confirmation of the schedule date or the date you will be able to meet.
If you can not meet our specified date or if your reply is not fully responsive to our request, it is highly likely that the overall schedule for completing the licensing review for this project will have to be extended.
If.you plan to appeal to Licensin3 canagement on any of the positions listed in Enclosure 1, please advise us of your intentions within two weeks.
D""D kpf Q
O mp g
A{-
<.z.
/
du
_ J]
s M'
OPPICS p guftM A ME D D ATE D Fom AEC.)l8 (Rn. 9.m AEC)I C2e)
- u. s. novEstMMEme? PmeNNMS O, 4}9he S.
4001150 D 2 b
i
, The Toledo Edison Company Because of the proprietary nature of the information contained in the enclosures; it is being withheld fro = public disclosure pursuant to Section 9.5 (a) (4) of 10 CFR Part 9 and Section 2.790 (d) of 10 CFR Part 2.
Withholding from public inspection shall not affect the ri;the of persons directly and properly concerned to inspect this document.
Sincerely, 2 p:al R :M 37 A. Schwencer, Chief Light Water Reactors 3 ranch 2-3 Division of Reactor Licensin;
Enclosures:
1.
Re;;ulatory Positions 2.
Requests for Additional Information ces: w/o enclosures Donald H. Hauser, Esquire Tha Cleveland Electric Illuminating Company P. O. Box 5000, Room 610 Cleveland, Ohio 44101 Cerald Charnoff, Esquire Shaw, Pit *m n, Potts, Trowbridge and Madden 910 l?th Street, N. W.
Washington, D. C.
20006 Leslie Henry, Esquire Fuller, Seney, Henry & Hodge 800 Owens - Illinois Building o n ]0 0
l 405 Madison Avenue o d; M Toledo, Ohio 43604 L
m m
D
\\
becs:
J. R. Buchanan, ORNL t
A1 T. B. Abernathy, DTIE JL rd a v
DMCE x7 86/ LWR 2-3 C-L%2-3:RL o,,,c.,
AScNencer OELD l
L.
- rm
,o...,
j/l4/75 J/je/75 3/r/ /75
- v.,
Form ABC 3IS (Rev. 9-53) AECM 0240 1lr u. s. sovet.nnent pointino orricas se74.sae.sse I
..