ML19329A848
| ML19329A848 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 03/23/1973 |
| From: | Sampson G TOLEDO EDISON CO. |
| To: | Anthony Giambusso US ATOMIC ENERGY COMMISSION (AEC) |
| Shared Package | |
| ML19329A849 | List: |
| References | |
| NUDOCS 8001150747 | |
| Download: ML19329A848 (3) | |
Text
_
AEC DISTRIEUTION FOR PART 50 DOCXET MATERIAL (TEMPORARY FORM)
COIiTROL NO: ~2099-FI7E FROM:
DATE OF DOC:
DATE REC'D L3 MEMO RP2 E.iER The Toledo Edison Company Toledo, Chio 43652 Glenn J. Samosen 1-29 7'E 3-90 77 Y
TO:
SE2iT LOCAL PDR v
Mr. H ambusso 1
CIASS:
@FROP IIGO IA7vT NO CYS REC'D DOCET liO:
X L
50-346 DESCRIP210ii:
ENCLOhdRES:
Ltr notarized 3-23-73, trans the following:
APPL FCR OPER LIC submitted ae Amdt # 14 dtd 12-11-72, notarized 12-8-72(3 crig & 20 cys)
NOTE: Ltr dtd 12-11-72 trans Tendered Appl as A=dt y 14.... Docketed & accepted FSAR VOLS 1 thru 7(70 sets) rec'd 3-30-73 3-30-73, Per Mr. Peltier.
t,rR D E Y
+++ APPL ONLY 3
"++FS.G & AFFL UO-MVc PLA?iT NA2ES: Davis-Bessee
- FSAR CNLY
- 1
'd.
FOR ACTION /I:.70R: ATION 2 21 77 e
BUILER(L)
++++ SCHWENCER(L)
ZIEMAIG(L)
YCUNGELCCD(E)
W/ Copies W/ 2 Copies W/ Copies W/ Copies CLARK (L)
STCLZ(L)
ROUSE (FM)
REGAN(E)
W/ Copies W/ Copies W/ Copies' W/ Copies GOLLER(L)
VASSALLO(L)
DICKER (E)
W/ Copies W/ Copies W/ Copies W/ Copies KNIEL(L)
SCHESL(L)
KNIGHICH(E)
W/ Copies W/ Copies W/ Copies W/ Copies IIEERNAL DISTRIBUTICN Su*M FTTM TECH REVIEW
- DENTCN F&M WADE E
- +++AEC PDR M RIE
- GRI1GS SMILEY BBOWN
-E
- ^**0GC, ROOM P-506A SCERCEDER
- GAMMILL NUSSEAUMER G. WILUAMS E
- MUNrZING/ STAFF
- MACCARY
- KASTNER SEPPARD E
- + CASE
- KNIung a pX BALLARD LIC ASST.
~
- GIAMEUSSO
- PAWLICKI SPANGLER SERVICE L
A/T IND BCYD
- SHA0 WIISCN L +++ BRAITMAN V. MOCRE-L(3WR)
++ STELLO ENVIRO
+++ GCUL3CURNE L SALTZPAN
- DEYCUNG-L(PWR)
+ HOUSTON
++ FULLER SMITH L
SKOVHOLT-L
- NOVACK DICKER GEARIN L
PLLTo
- P. COLLINS
- RCSS
- KNIGEICN DIGGS L
++ MCDONALD
- IPPOLITO YOUNG 2I4CD TEETS L
- DUEE REG OPR
- TEDESCO REGAN LEE L
- FILE & REGION (2)
- LONG
+PEGI LEADER FAIGRET L
INFO MCERIS
- LAINAS THCMPSCN, HL.
SHAPER F&M
- C. MILES STEELE
- BENARCYA EARLESS
++SCEMIDT
+gla.gE l
- VOILMER
++PANZAP m a t'Twom f. STsmu75mrcn
'y l
- N 1-IfCAL PDR Port Clinten, Chio
- l-DTIZ( A3ER'IATHY)
- (ad(E)(31-NATIONAL IA3's 1-PDR-SAN /LA/NY err
- +? l-ESIC(EUCHANAN) 1-R. CARROLL-C, GT-3227
- l-GERAI.D T.mrUCHE
- l-ASLB-YCRE/!GT. hie:
1-3. CATIri,E-256.-GT' BROCKHAVEN NAT. LG
' h fH ST.
1-CCESULTA'Tr's
+++ l-AG'ED('JE KCESTER.
16-CYS ACFS HCLDHiG (PSAR)
Ignt:K/3LU:E/AGABIAN RM C h27, GT) 3 CY3 APPL acLDniG l-GERLAD ULEIKSCN....CRNL 1-RD... MULLER.. 7-309GT
. _ _.. _ _. aM u50 2h' _ -
Reguletory File Cy.
TOLEDO EDISON GLENN J. SAMPSCN March 23,1973 v c= Pr== a ac. ao*=r e \\19 Dockte 50-346
/ \\
4 4,
+y r.4='I Mr. A. Giambusso, Deputy Director 4
for Reactor Projects 9
4 Directorate of Licensing g
United States Atomic Energy Commission 4
Washington, D.C.
20545 A
03
Dear Mr. Giambusso:
Under separate cover, we are transmitting seventy (70) copies of the Final Safety Analysis Report (FSAR) for the Operating License Application for che Davis-Besse Nuclear Power Station. The FSAR has been revised to ir clude all material submitted for your acceptance review and is considered the initial submittal fer your detailed review. Any future revisions to the FSAR will indicate the revision or change in accordance with procedures contained in the " Standard Format and Contents of SARs."
All other documents required by Section 50.30 of 10 CFR Part 50 have been submitted previously.
Three (3) original and twenty-five (25) conformed copies of the trans-mitt.al sheet are enclosed.
We sincerely appreciate your timely acceptance review and your letter of March 9,1973 informing us of accepcance of the FSAR for docketing.
Yours very truly,
/
'JJ/
\\\\ N
(
g a
GJS.r
~
ts o g"s 0 %73 ",5 Enclosure L.
g VAIL 6
occ.EI e
P I.CO THE TOLEDO ECISCN CCMPANY ECISCN PLAZA 300.VACISCN AVENUE TOLEDO, CHIO 43552
March 23,1973 APPLICATION FOR LICENSES FOR DAVIS-BESSE NUCLEAR POWER STATION Docket 50-346 Enclosed herewith are seventy (70) copies of the Final Safety Analysis Report (FSAR) for the above entitled application which has been updated to reflect all information submitted for acceptance review.
THE TOLEDO EDISON COMPANY By '
-[/f fd.m y,
c,e
/v 7-Vice Presid!nPower Sworn to and subscribed before me, this 23rd day of March,1973.
c, he MA)
[
o
._.