YEB 2 1973 Docket No. 50-269

~ '

_1 D. Knuth, Assistant Director for Reactor Safety, L OCONEE 1 - SUPPLEMENT TO SER ON FUEL DENSIFICATION At a meeting on February 2,1973, D. Ross and I prepared the enclosed schedule for the review of the fuel densification effects on Oconee 1 (designated by Projects as the B&W 1ead plant). The second enclosure identifies staff members responsible for the various review subjects and other pertinent information.

Project Me..sger for Oconee 1 is Irv Peltier (Room 342, Ext. 7548) in PWR-4.

He will tatsure that the applicant (Duke) is kept informed of our review status. Overall review of fuel densification for Oconee lihoordinated by Hans Schierling (Room 218, Ext. 7701). He should participate in all

{

a discussions (meetings and telcon) between the staff and B&W. He will keep

)

Irv Feltier informed and prepare the SER Supplement.

Q The review should be based on the following mate tal that was submitted by q

the applicant and by B&W:

BAW-10054, Topical Report, January 1973: " Fuel Densification Report" (Proprietary) o BAW-1387, January 1973: "Oconee 1 - Fuel Densification Report" (Proprietary)

~

Each reviewer should keep a list and copy of all material used in his review.

k 1

MM

, w%g l

H. E. Schierling PWR Project Branch No. 2 1

Directorate of Licensing cc:

N. Lamben S. Kim D. Davis "I*

Distribution:

Docket file D. Houston

~

"E

'"E I. Peltier l

A. Schwencer V. Ste&lo T. Novak l

1 PWR-2 f,/jf,-4 _

j

,,cg,

HSchierling:bn sunname >

i 2/2/73 DATE>

I Focus AEC-Ste (Rev.9-53) AECM 0240 e u s coveawam Pme.se own 1972-466-903 -

tN 8001090 Y g

/e

X, ENCLOSURE 1 OCONEE 1 REVIEW SCHEDULE FOR FUEL DENSIFICATION (all dates are. latest possible to meet May 1, '73 as deadline to issue SER Supplement) 1.

Feb. 12 Draf t questions to H. Schierling 2.

Feb. 17 Draft questions to B&W and Duke 3.

Feb. 23 Discussion of 'draf t questions with B&W complete 4.

Feb. 26 Written questions to Duke and B&W Staff visit to B&W fuel fabrication facility 5.

Mar. 2 6.

Mar. 6 Written answers from Duke (B&W) 7.

Mar. 13 Review of all answers completed 8.

Mar. 16 Additional draft questions to B&W and Duke Discussion of additional questions completed 9.

Mar. 23 10.

Mar. 27 Written answers from Duke (B&W) 11.

Apr.

3 Staff review completed Provide draf t of SER Supplement to H. Schierling 12.

Apr. 6 1st Draf t SER Supplement completed and to authors 13.

Apr. 12 H. Schierling with comments 14.

Apr. 15 1st Draft SER Supplement returned 2nd Draft SER to D. Knuth, A. Schwencer, authors 15.

Apr. 17

. 3rd Draf t, SER Supplement completed and distributed for review 16.

Apr. 23

17. Apr. 27 SER Supplement completed in final form
18. May 1

Issue e

i s.,.;

f i

-y ;

y -.

_m_

i

,9 t

ENCLOSURE 2 REVIEW. ASSIGNMENTS, FUEL DENSIFICATION, OCONEE 1 9

Subject'~

Gao conductancejincluding Time to en11nn<;n, Stendy State.an d, Nuclear Aspects, Accidents-fuel performance -(swelling including creep-transients (loss.

(poact spike LOCA, non-

~

~

thermal expansion,

.model of flow and locked-model, rod-limiting densification) rotor ej e c tion)..

accidents,'

steam line break.

Reviewe r N., Lauben S..Kim D. Davis:

H.- Richings N. Lauben D. Ilauston L. Kopp

. H. Schierlint:

H. Schierling P. Pankaskie (PNL)-

D. Rowe (PNL)

Brookhaven none Consultan t ; K. Hann (PNL)

B&W Code TAFY CRECOL unknown, no

PDQ07, CRAFT-THETA-i name or possibly REFLOOD-details avail.

othe rs Staff Code GAPCON BUCKLE COBRA III-c -