ML19329A687
| ML19329A687 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 03/17/1975 |
| From: | Thies A DUKE POWER CO. |
| To: | Anthony Giambusso Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8001090672 | |
| Download: ML19329A687 (2) | |
Text
.
NRC D' RIBUTION FOR PART 50 DOCKET iTE RI AL (TEMPORARY FORM)
CONTROL NO: 302O FILE:
Duke Power Company DATE OF DOC DATE REC'D LTR TWX RPT OTHER FROM:
3-17-75 3-20-75 XX te ORIG CC OTHER SENT AEC PDR_
XX U
10:
o.a signed SENT LOCAL PDR Me ciambusso CLASS UNCLASS-PROPINFO INPUT NO CYS REC'D DOCKET NO:
1 50-270 X;"XXXX ENCLOSURES:
DESCRIPTION:
Ltr requesting an extension of the initial fuel cycle to allow the fisst reactor core to be operated up to the limits established gig s.,
by tech specs.....
t/sj; ] i'.s.gl'm.
I0 +f ?.
- l i, * !(
PLANT N AME: Oconec #2 FOR ACTION /INFORMATION 3-24'-75 chf BUTLER (L)
SCHWENCER (L) ZIEMANN (L)
REG AN (E)
W/ Copies W/ Copics W/ Copies W/ Copies CLARK (L)
STOLZ (L)
DICKER (E)
LEAR (L)
W/ Copies W/ Copics W/ Copics W/ Copies PAR R (1.1 V ASS ALLO (L)
KNIGHTON (E)
SPELS W/ Copies W/ Copics W/ Copics W/ Copies YOUNGBLOOD (E)
KNIEL (L) fRPLE (L)
W/ Copics W@opies W/ Copics W/ Copies INTERNAL DISTRIBUTION En en e n r 3 LECH REVIEW DENTON LIC ASST A/T IND.
/*NRC PDH SCHROEDER GRIMES R. DIGGS (L)
BRAITMAN
/OGC, ROOM P 506A MACCARY GAMMILL H. GEARIN (L)
SALTZMAN GOSSICK/ STAFF KNIGHT KASTNER E. GOULBOURNE (L)
MELTZ f
PAWLICKl BALLARD P. KREUTZER (E)
GIAMBUSSO SHAO SPANGLER J. LEE (L)
_PL ANS, CASE BOYD STELLO M. MAIGRET (L)
MCDONALD
- MOORE (L)
HOUSTON
_E NVI R O_
S. REED (E)
CHAPMAN DEYOUNG (L)
NOVAK MULLER M. SERVICE (L)
DUBE (Ltr)
E. COUPE f. SHEPPARD (L)
PETERSON S
SKOVHOLT (L)
ROSS DICKER GOLLER (L) (Lir)
IPPOLITO KNIGHTON M. SLATER (E)
P. CO LLINS TEDESCO YOUNGBLOOD H. SMITH (L)
HARTFIELD (2)
DENISE LONG REGAN S. TEETS (L)
KLECKER REG OPR LAINAS PROJECT LDR G. WILLI AMS (E)
EISENHUT WlGGINTON
/ FILE & REGION (2)
BENAROYA j$ce./c.sf; V. WILSON (L)
T.R. WILSON VOLLluER HARLESS R. INGRAM (L)
./
Y e, 7
STEELE M
EXTERN AL DISTRIBUTION LOCAL PDR M/ I 7L e 3' c' 4
1 - PD R.S AN/L A/NY 1
f TIC (ABERNATHY) (1)(2)(10) - N ATION AL L ABS.
1 - BROOKH AVEM N A I LAB 1
f NSIC (BUCHANAN) 1 - W. PENNINGTON, Rrn E-201 GT 1-1 - G. ULRIKSON,0.t.* L t'
1 - ASLB 1 - CONSU LTANTS 1 - AGMED (RUTH GUSS*/.A 3 1 - Newton Anderson NEWM ARK /BLUM E/AG B ABI AN Brn B.127 GT ACRS IM/SENp 1 - J. D. RUNKLE'S Rm E 203 fg
,j. SA,fp 8001090[72 g
67
v.,
DUKE POWER COMPANY Powza Burr.omo Tz,N. C. esaos 4ea Sourn Cuunca Srazzr,CuAar.or q';"~
EsMIOR V E E IDENT aNo ToassuissioN h
PaoDUCTION 7g [/c s D
L March 17,1975 i
s,q vi[ ' A'w
,y j'y\\
jN
~
'h/
4 Mr. legelo Giambusso, Director
~h Division of Reactor Licensing U. S. Nucicar Regulatory Commission 20555 Washington. D. C.
Oconee Unit 2 Re:
Docket No. 50-270
Dear Mr. Giambusso:
i interval Oconee Technical Specification 1.2.8 states that the t me d 18 months between normal refuelings of the reactor is not to exceeInitial fuel loading of without prior approval of the Commission.
l would Oconee 2 commenced on October 9,1973; the 18 month intervaSta d in low initial fuel extend to April 9,1975.
l extensive maintenance outage time, have resu teBased on curre 1976 factor, Oconee.2 may be operated until approximately May 23, utilization.
f fective full power without exceeding the operating limit of 11,040 ehou h first core.
i d set by It is our understanding that the 18 month refueling per oeillance Technical Specification 1.2.8 is intended to assure that surv l Specifications, requirements identified in Section 4 of the Technicarformed at intervals which are specified as to calendar interval, are peFor Oconee 2, all surv h 18 month interval not exceeding 18 months.
to calendar interval has been performed such that t eTherefore, we be operated will not be exceeded. fuel cycle be extended ts allow the first reactor up to the 11,040 effective full power hours esta Specification 3.11.1.
XM2
/ ',,,aw -,
,.(
f
$:yf" Very truly yours,
.o.m w y,,
~
te w,... v 3
^A. C. Thies d'
RIEEd' i
3020 Eg
\\ ((.7 g (. h ACT:vr
' l
- 'Wtr
.-._g
,