Accepts New Reactor Bldg Insp Schedule Per Amend 34,Revision 22.New Schedule Slips Each Insp 6 Months from Original Date Throughout Life of Plant
ML19329A671
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 09/21/1972
From: Peltier I
US ATOMIC ENERGY COMMISSION (AEC)
To: James Keppler
US ATOMIC ENERGY COMMISSION (AEC)
References
NUDOCS 8001090655
Download: ML19329A671 (1)


Text

_ _ _ _ _ - _ _ _ -

/

b ty Docket No. 50-269 SEP 01 G72 J. G. Keppler, Reactor Testing and Operations Branch, DRO A. Schwencer, Chief, Pressurized Water Reactors BranNTE.I@[twencer 3@T THRU:

Albert Sc OCONEZ UNIT 1 REACTOR BUILDING INSPECTION INTERVALS By Amendment 34, Revision 22, the Oconee Unit 1 Technical Specification was revised to state a new reactor building inspection schedule. We have reviewed this new schedule and find it acceptable.

In effect this new schedule slipe each inspectior six (6) months from its original date throughout the life of the plant.

OMn:d Signed by N8E A.Peltfec,

I. A. Peltier, Project Manager Pressurized Water Reactors Branch No. 4 Directorate of Licensing cc:

R. C. DeYoung l

R. R. Maccary M. Hildreth C. Murphy F. Schauer DISTRIBUTION i

Docket l

PUR-4 Reading l

RP Reading l

IAPeltier l

ASchwencer

omer,

,,,,,,,,,,,_PW -4 PWR-4 IAPelt ASct@gacer SURNAME >

DATE>

Form AEC-Ste tRev. 9-53) AECM 0240

c. s. covraNMENT PRCfflNG OFFICE.1970 O. 405 344 8 0 01090 dif8 8