b ty Docket No. 50-269 SEP 01 G72 J. G. Keppler, Reactor Testing and Operations Branch, DRO A. Schwencer, Chief, Pressurized Water Reactors BranNTE.I@[twencer 3@T THRU:
Albert Sc OCONEZ UNIT 1 REACTOR BUILDING INSPECTION INTERVALS By Amendment 34, Revision 22, the Oconee Unit 1 Technical Specification was revised to state a new reactor building inspection schedule. We have reviewed this new schedule and find it acceptable.
In effect this new schedule slipe each inspectior six (6) months from its original date throughout the life of the plant.
OMn:d Signed by N8E A.Peltfec,
I. A. Peltier, Project Manager Pressurized Water Reactors Branch No. 4 Directorate of Licensing cc:
R. C. DeYoung l
R. R. Maccary M. Hildreth C. Murphy F. Schauer DISTRIBUTION i
Docket l
PUR-4 Reading l
RP Reading l
IAPeltier l
ASchwencer
- omer,
,,,,,,,,,,,_PW -4 PWR-4 IAPelt ASct@gacer SURNAME >
DATE>
Form AEC-Ste tRev. 9-53) AECM 0240
- c. s. covraNMENT PRCfflNG OFFICE.1970 O. 405 344 8 0 01090 dif8 8