Summarizes 720920 Telcon W/Util Re Shutdown Tech Spec,Fire Protection Sys & Clarification of New Reactor Bldg Structural Insp Schedule
ML19329A668
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 09/21/1972
From: Peltier I
US ATOMIC ENERGY COMMISSION (AEC)
To:
US ATOMIC ENERGY COMMISSION (AEC)
References
NUDOCS 8001090653
Download: ML19329A668 (1)


Text

SEP 21 STL NOTE TO' FILES TELECON WITH K. CANADY - DUKE POWER COMPANY SEPTDBER 20, 1972 OCONEE - GENERAL MATTERS 1.

Duke was advised that a shutdown tech spec may be required to cover the event that.a flood condition (PMF) at the intake structure could result in a flood level of 810 ft. above sea level within six (6) hours of reaching the 807 ft. level.

2.

Duke was asked to look at the fire protection system in the cable spreading room to see if actuation of this system could disable safety related equipment.

3.

Clarification of the'new reactor building structural inspection schedule (Amendment 34, Revision 22) established that each inspection on the old schedule is. slipped by six (6) months on the new schedule.

We find this acceptable.

\\,,('-

I. A. Peftier, Project Manager Pressurized Water Reactors Branch No.4 Directorate of Licensing cc: