ML19329A661

From kanterella
Jump to navigation Jump to search
Discusses 720920 Telcon W/Util Re Committments to Place Peak Recording Accelerometers on Major Equipment in Reactor Bldg & to State That Units 2 & 3 Will Have Same Forcing Functions & Vibration Response as Unit 1
ML19329A661
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 09/21/1972
From: Peltier I
US ATOMIC ENERGY COMMISSION (AEC)
To:
US ATOMIC ENERGY COMMISSION (AEC)
References
NUDOCS 8001090647
Download: ML19329A661 (1)


Text

.,

1 SEP 21 '371 NOTE TO FILES TELECON WITH DUKE POWER COMPANY (CANADY, MILLER) AND LICENSING (LANGE, HOU, BRA M, PELTIER)

OCONEE MEB CONCERNS - SEPTEMBER 20, 1972 This conference call was made to clear up a couple of remaining concerns that MEB raised during the Oconee 2/3 review.

1.

Duke committed to placing peak recording accelerometers on major equipment in the reactor building other than piping cs now stated in the application. This satisfies MEB that equipment with damping factors greater than 1/2% will be surveyed.

2.

Duke cocmitted to stating in its application that Units 2/3 will have the same forcing functions and response to vibration as Unit 1 and that any corrective actions taken on Unit 1 will be t'aken on Units 2/3.

Duke will also state that the test program on the main steamline is typical of Duke's practice for all systems suspect (from operating reports) of having a vibration or deflection problem. MEB finds this acceptable.

gy' I. A. Peltier, Project Manager Pressurized Water Reactors Branch No. 4 Directorate of Licensing cc: A. Schwencer D. Lange I. Peltier 1