ML19329A659

From kanterella
Jump to navigation Jump to search
Forwards RO-287/76-18
Date released: 12/09/2019 Download: ML19329A659


RO 287/76-18:on 761009,turbine Bldg Partially Flooded.Caused by Procedural Inadequacy Failing to Isolate Air Supply & Valves Designed Not to Open Upon Power Loss.Submerged Equipment Evaluated.Station Design Reviewed
ML19329A663
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 10/25/1976
From:
DUKE POWER CO.
To:
References
Download: ML19329A663 (4)
Forwards RO-287/76-18
ML19329A658
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 10/25/1976
From: Parker W
DUKE POWER CO.
To: MOSELEY N C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19329A658 (2)