ML19329A653
| ML19329A653 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 01/02/1973 |
| From: | Peltier I US ATOMIC ENERGY COMMISSION (AEC) |
| To: | Klecker R US ATOMIC ENERGY COMMISSION (AEC) |
| Shared Package | |
| ML19329A654 | List: |
| References | |
| NUDOCS 8001090636 | |
| Download: ML19329A653 (1) | |
Text
,.
I T
r JAN 2 9 73 Docket Nos. 50-269/270/287 f
R. W. Kleckar, Technical Coordinator for Pressurized Water Reactors, L THRU A. Schwencer, Chief, Pressurized Water Reactor Branch No. 4, L PRELIMINARY INFORMATION ON STEAM-LINE-FEEDWATER-LINE BREAK FOR OCONEE UNIT 1, 2 and 3 In response to our December 15, 1972 letter to Duke Power Company on the subject matter Duka has providedtth enclosed preliminary information ofr our review. Since Oconee 1 will be ready for fuel loading'in late January 1973 (not withstanding the plant modifications suggested in the enclosure) our expeditions review of this preliminary information is warranted.
Original Signed By A.Schwenty I. A. Peltier Project Manager PWR-4 cc: IAPeltier w/ encl.
DISTRIBUTION ASchwencer w/ encl..
Docket File (3)
RCDeYoung w/ encl.
PWR-4 Reading CLong w/ encl.
RP Reading DLange w/ encl.
1 l
1 l
f PWR-4 M
hid m icr >
f IAPelt r:kmf AS, awencer.
sunnanc,
onn >..1/...../.Z3
.1/.,__/.Z2__.
4 perus AEC-31e (Rev. 9-53) ABCM 0240
- u s covt=NucwT pamrran orrier. 1972-466-9e3 bN g
8001090