_ _ _ _ _ _ - _ _ _ -
s ='
Docket Nos. 50-269"n s 2.~'*
MG 3 9 m
~
50-270 and 50-287 R. C. DeYoung, Assistant Director for Pressurised Water Reactors, Licensing TERU:
A. Schweecer, Chiaf, Pressurised Water Reactors Branch No. 4 L TELECOM VITH KEN CANADT, DUKE POWER COMPANT - OCONFI 1, 2, AND 3 SCHEDULRS AUGUST 25, 1972 E. Casady called in the following schedule information Unit 1 Unit 2 Unit 3 Hot Punctional Testa 12/1/72 2/15/73 12/1/73 Fuel Loading 1/15/73 4/15/73 2/1/74 Commercial Operation 6/1/73 9/1/73 6/15/74 The fuel loading date for Unit i r==ains at 1/15/73 although RO is still saying 2/73. The fuel loading date for Unit 2, however, has slipped one
_j month from 3/15/73 to 4/15/73. Puel loading for Unit 3 has advanced one month from 3/1/74 to 2/1/74. It does not appear that any of these changes warrant significant rescheduling action except one month extension on the Units 2/3 review (slip ACRS one month) would give some relief to the review groups whose schedules are tight for the November ACRS meeting, particularly MEB. I do not recomend slipping the ACRS meeting at this time, however, since the.0conee Unit i supplement must go to the ACRS in November.
l 1
Commercial operation for Unit 2 has slipped three months in the Duka estimate which indicates Unit 2 will not be available for suminer 1971 peak loads.
Original signed by Irnag.1. peltieg,
I. A. Peltier, Project Manager Pressurized Water Reactors Branch No. 4 Direetorate of Licensing es:
J. G. Kappler J. B. Hondarson DISTRIBUTiuN Docket (3)
RP Reading PWR-4 Reading ASchwencer i Geltier L:PWR f_,,, _
, L:PUR-4 4
omer >
s
. ~
.e.}.t.
- q,.AS).hwencer
$URNAME >
8/gp2....l.sfa./72 om,
.wo na-is-sius-i uwe Forra AEC-SIS (Rev. 9-53) AECM 0240 8001070[h 1