ML19329A624

From kanterella
Jump to navigation Jump to search
Discusses 720830 Telcon W/Util Re Installation of 54 Instead of 60 Thermocouples in Steam Generator B
ML19329A624
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 09/01/1972
From: Peltier I
US ATOMIC ENERGY COMMISSION (AEC)
To:
US ATOMIC ENERGY COMMISSION (AEC)
References
NUDOCS 8001070637
Download: ML19329A624 (1)


Text

L. _, _

i. r.

s 3:?

l'ii NOTE FOR FILES TELECON WITH KEN CANADY, DUKE POWER COMPANY, AUGUST 30, 1972 STEAM GENERATOR B THERMOCOUPLES - OCONEE UNIT 1 K. Canady called to report that only 54 instead of 60 thermocouples would be reinstalled in the Oconee Unit 1 steam generator B. The original 60 units were a special prepared package that required only 12 penetrations through the steam generator hand hole. There is not time to order another package of this type and so a conventional TC installation had to be made requiring 60 penetrations. The hand hole has only enough room for 54 TC. \\. I. A. Peltier, Project Manager Pressurized Water Reactors Branch No. 4 Directorate of Licensing cc: R. C. DeYorng A. Schwencer .D. Lange I. A. Peltier s = ) 8001070 $ 7 .}}