ML19329A624
| ML19329A624 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 09/01/1972 |
| From: | Peltier I US ATOMIC ENERGY COMMISSION (AEC) |
| To: | US ATOMIC ENERGY COMMISSION (AEC) |
| References | |
| NUDOCS 8001070637 | |
| Download: ML19329A624 (1) | |
Text
L. _, _
i. r.
s 3:?
l'ii NOTE FOR FILES TELECON WITH KEN CANADY, DUKE POWER COMPANY, AUGUST 30, 1972 STEAM GENERATOR B THERMOCOUPLES - OCONEE UNIT 1 K. Canady called to report that only 54 instead of 60 thermocouples would be reinstalled in the Oconee Unit 1 steam generator B. The original 60 units were a special prepared package that required only 12 penetrations through the steam generator hand hole. There is not time to order another package of this type and so a conventional TC installation had to be made requiring 60 penetrations. The hand hole has only enough room for 54 TC. \\. I. A. Peltier, Project Manager Pressurized Water Reactors Branch No. 4 Directorate of Licensing cc: R. C. DeYorng A. Schwencer .D. Lange I. A. Peltier s = ) 8001070 $ 7 .}}