ML19329A620
| ML19329A620 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 03/24/1972 |
| From: | Peltier I US ATOMIC ENERGY COMMISSION (AEC) |
| To: | Deyoung R US ATOMIC ENERGY COMMISSION (AEC) |
| References | |
| NUDOCS 8001070631 | |
| Download: ML19329A620 (1) | |
Text
c atgo-ar wuum NAR 2 41972 R. C. DeYoung, Assistant Director for Pressurized Water Lactors. DRL THRU:
A. Schwencer, Chief. Pressurized Water Reactors Branch,No. 4, DRL TELECOM WITH RDT REGARDING OCONRE 1 STEAM DAMAGE on March 23, 1972, I was called by Milt Shaw, RDT. He had been Macussing the Oconee problem with t'a===4 asioner Ramey and called for the latest f information.
I gave him the same information I gave Whitman in an earlier telephone conversation. He also asked if Westinghouse and Combustion had the same arrangement for instrument tubes. I told him that Westinghouse arrangement was similar in that instruments came through the bottom head but design features may be different and that Combustion arrangement was through top head.
He requested to be kept informed on developments.
I. Peltier, Project Leader Pressurized Watar Reactors Branch No. 4 Division of Reactor Licensing
/
cc E. Bloch P. A. Morris
/
P. Schroeder E. G. Case k
D. Lange R. C. DeYoung A. Schwencer W. Mcdonald M. Rildreth I. A. Peltier PWR Branch Chiefs DISTRIBUTION Docket PWR-4 Reading DRL Reading DE: peg,,,,,,,,,,D E 3,y,W-4 d m, omer >
"1EhriemPASchwen(esy sumswc >
om, 3h'//.72........3 /..T- - - -/72 Form AEC-SIS (Rev. 9-53) AECM 0240 isa
,s...aste n
.raics,i
..a l
8001070 h [
g i