Forwards Review of Draft Industrial Security Plan in Response to Technical Assistance Request
ML19329A604
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 06/16/1972
From: Knuth D
US ATOMIC ENERGY COMMISSION (AEC)
To: Deyoung R
US ATOMIC ENERGY COMMISSION (AEC)
References
NUDOCS 8001070607
Download: ML19329A604 (3)


Text

, ~,

e dUfi 1 $ 372 R. C. DeYoung, Assistant Director for Pressurised Nater Reactors, L RES?CNSE TO TECHNICAL ASSISIXiCZ REQUESI - CCOUEZ NUCLEAR STATIC:i, 2E7IEW OF DRAFT INDUSTRIAL SEMTRITY PLAN As requested informally, work has been completed as indicated in the block that follows.

Our conclusions are contained in the attached report.

Orignal Signed by Donald F. Knuth Donald F. Knuch, Assiatant Director for Reactor Safecy Directorato of Licensing

Enclosure:

As stated Plant Name:

Oconee Nuclear Station Units 1, 2, & 3 Licansing Stage:

OL 11ocket No. :

50-269, 270, 287 3rsnch and Project Leader Requesting Assistance:

PWR-4, I. A. Peltier Requested Completion Date:

Not given Description of Review:

Review Draft Industrial Security Plan Review Status:

Complete er: w/ encl:

S. H. Hanauer, DRTA J. M. Hendrie, L:TR I. A. Peltier, L:?WR-4 A. Schwencer, L:PWR-4 D. Thocapson, L:CSB

~ C. R. Van Niel, L:0SB cc w/o enc 1:

W. Mcdonald, L:0PS L:0SBM L:0SB g L:TR o m cE >

CRVa'nNiel

_ _ _........[p s o n DFKauth DThom SURNAME >

8/,I 2

..l....p..../72

/7 8/

8 /;, /.......

/72 DATE >

Form AEC-31s (Rev. 9-53) AECM 0240

1. S. 00VERNMENT PRDrTDiG OFeICE : 1,73 0 405 344 8001070 [O 7

j i.

x-Draft Industrial Security Plan

/

' Oconee Nuclear Station Docket Nos.. 50-269, 270, 287 a

I have reviewed the draft Industrial Security Plan, undated, submitted infomally by Duke Power Co. with a memo dated August 2,1972. The plan is unacceptable as presented.

It is' incomplete in that several areas of concern are not covered, and of those areas addressed, many are lacking the required detail.

Using the draft 33 criteria as a guide, the following additional information will be required:

C riterion -

Deficienev/ Additional Information Reauired 8

Specify the size of the guard force on shift.

9 State and justify the time for deployment of the security force.

12 What provisions have been made to secure the doors.to the Service Building and the south end of the Turbine Building?

13 Criterion not specifically addressed.

16 Criterion not specifically addressed.

17 State that personnel access will be controlled because of security requirements, in addition to HP requirements.

18 Criterion not specifically addressed.

21 Criterion not specifically addressed. Also see comment for criterion 12.

22 Are any intrusion alarms planned for the site? If so, 23 24 explain.

28' Criterion not specifically addressed.

e

~ -

-7,

-4.

291 Criterion parts a sad b not specifically addressed..

31 ~-

More than one procedure will be required to fully implement the plan.

l It is recommended that the plan be 'reorg ized and rewritten to provide the additional information requested.