Summarizes Events Following 720310 Rept Re Hpis Inadvertent Actuation During Hot Functional Tests
ML19329A591
Person / Time
Site: Oconee 
Issue date: 03/10/1972
From: Peltier I
US ATOMIC ENERGY COMMISSION (AEC)
To:
US ATOMIC ENERGY COMMISSION (AEC)
References
NUDOCS 8001070588
Download: ML19329A591 (1)


Text

vo-636M C

_s giC NCffE TO FIIZ CCONEE 1 HPI SYSTEM INADVERTENT ACTUATION DURING HOT FUNCTIONAL TESTS Max.Hildreth, en 3/10/72, reported to PWR-4 that during the hot functional testing in Oconee the HPI System was inadvertently actuated frcm the building 4psig over pressure circuits.

A meeting was held the same day between DeYoung, Schwencer, Peltier, Pavlicki, Klecker, Maccary, Hildreth and Keppler to discuss the situation.

.It was decided that mere infor=ation was needed from Duke regarding the vessel metal temperature experience before any conclusiens cculd be reached.

In a subsequent telephone call the same day to Earton, Smith and Canady of Duke it was learned that:

1.

The safety systems actuated from the kpsig system did worx.

2.

The injection system pumps operated for about tso minutes.

3 The actuation was the result of tests being perfor=ed en 10psig building over pressure sensors.

h.

The k reactsr ecolant pumps were operating and the system was at aboct 2200 psi and 530cy, Duke was to call back after it had a chance to check with 3 & W cn the temperatures in the vessel.

Hopefully this same day.

MF V

I. A. Peltier ec:

J. Peltier A. Schwencer S. Pawlicki R. DeYoung M. Hildreth 8001079 6 d s

.