Text
i
~
l DISTRIBITTIOM Docket DRL/PWR BCs PWR #4 Reading A. Schwencer DRL Reading H. Faulkner DR Reading F. W. Karas F. Schroeder DRS BCs T. R. Wilson R. DeYoung R. S. Boyd f
DEC 7 Ell R. W. Klecker t
S. H. Hanauer H. Denton OGC (Knotts)
E. G. Case. Director Division of Reactor Standards TECHNICAL ASSISTANCE We are in the final stage of processing Oconee Unit i for licensing and request your assistance in resolving the following problems:
- 1. Establish the basis for acceptability for instru.mantatirin and control cabling for Unit 1 and separately for Units 2 and 3.
- 2. Establish the basis for acceptability for the Oconee Unit 1 integrated leak rate test..
Original Signed l[]
Peter 6.M_g!I)J P. A. Morris, Director Division of Reactor Licensing
Enclosures:
As stated 1
1' I
l o,ncr >
rfp,-g' PWR f AD/PWRs.
DRL: R A. Se cer P.
Morrin SURNAhnt>
~
Il'.*
12/6/71 12/4/71 12/_h/71_
h.
%n>
t;,
ac. min..-m acx om
. n
- c..
.o. - - -,o
~ ~ '
8001070 8 b ma w-y-
+
REQUEST FOR DRS ASSISTANCE Proj ect: Oconee Units 1, 2 & 3 Docket Nos.: 50-269, 50-270 &
Project Leader:
A. Schwencer 50-287 Type of Review:
Operating License REQUESTED WORK Determine minimum acceptable physical separation Gn inches or otherwise) for redundant I & C cables in cable trays.
FSAR Revision 16 Figure 8-7 depicts Duke's solution to an overfill problem discovered by Compliance prior to July,1971.
Since then additional cables were added causing additional overfilling.
Determination on separation is required on Units 1, 2 and 3.
On Unit 1 essentially all cables are now in place.
On Units 2 & 3 very little cable pullinghas been accomplished. To assure that minimum acceptable corrective action is taken on Unit I and maximum practical preventive action is taken on Units 2.and 3, it is requested that the determination of minimum acceptable separations be addressed separately.
Slides of Unit 1 cable overloading are available.
REQUESTED COMPLETION DATE A site visit to observe the extent of cable overfill was made November 30, 1971. The applicant is in the final stag of preoperational testing on Unit 1 and should be notified as soon as possible whether corrective at-ion will be required. Therefore a completion date of December 10, 1971 is requested.
Requested by RP Branch Chief Approved by DRL/AD Signed:
.dD/
- b. j'~ h -
,/
Signed:./
,r
,s
[f
/
t REQUEST FOR DRS ASSISTANCE A. Schwencer Project Leader:
Docket No.: 50-269 Project: Oconee Unit 1 Type of Review: Operating License 71 REQUESTED WORK ned R. T. Carlson memo dated November 17,19 The Duke Power Company Integrated t
Determine whether test procedure deficiencies noted in at a_
Leak Rate Test.
b 1, 1971. -
warrant rejection of the Oconee Unit 1 Containmentwas distributed within AEC on Novem er Dated October 29, 1971 Leak Rate Test Report, REQUESTED COMPLETION DATES _
The applicant currently has a window of time 10, 1971.
h d if AEC so requires. Applicant believes
_As soon as possible, but prior to Decemberin which a retest can be accomplis e by conference (now to December 24, 1971) he can justify not repeating tests and wishes to present reasons 6-10, 1971.
Bethesda (if need be) the week of December Approved by DRL/AD Recuested by RP Branch Chief f,