- NOTE TO FILE GELECON WITH aJKE ON OCONEE CT-4 TRANSFORME2 f
On March 7,15r(2, Bob Pollard and 7. discussed the CT-4 transforme.r in the switchgear block house at OqGnee with Ken Canady and Chuck Wylie The following infornr tion was given by Duke.
a of Duke.
1.
The transformer (.-4) is separated from the switchgear in the block house 'oy a firewall of reinforced concrete block and a steel r..Lidown door normally closed by administrative
-procedures.
2.
The transformer is an oil filled transformer but the trans-former room has a drain under the transforter and a trench or sill preventing the flow of oil into the switchgear room.
The transformer room is vented against explosion, and protected 3
Ggainst tornado missiles.
The transformer has emulsifier fire protection tripped by 4..
shorteircuit and no switchgear cables pass through the trans-former room.
I. A. Peltier ec: