Text
a.
4-JAN 211971 Peter A. Morris, Director Division of Rasctor Licensing DUKE POWER COMPANY, OCONEE UNIT NO.1, DOCKET NO REACTOR BUILDING STRUCTURAL INSTRUMENTATION i
This evaluation of the adequacy of the supplemental instru-i mentation proposed for installation on the Oconee No.1 reactor building was prepared by the DRS Structural Engine-ering Branch.
Or41"$1 84"'
n C. Caw Edson C. Case Director Division of Reactor Standards
Enclosure:
Supplemental Instru-mentation Evaluation ec w/ encl:
S. Hanauer, DR R. DeYoung, DRL
- 1. Boyd, DRL D. Skovholt, DRL
A. Schwencer DRL DR RF F. Schauer DRS RF SEB RF bec:
E. G. Case dl
/*)
6,Iric....
h...
W ICE >
3 D
accary C a Sch uer: ewe
.. A/
SURNAME >
"1 1
..,.h..
.1.~
..1" 8..?.71...
DATE >
uisovutnutwTretuimGommime-o 364-see Furssa AEC=818 (Rev.9-63) 8001070fdf A
OCONEE U!IIT NO.1 - REACTOR BUILDING Docket No. 50-269 REACTOR BUILDING SUPPLEMENTAL INSTRUMENTATION, The reactor building instrumentation report dated December 30, 1970, submitted by the applicant has been reviewed.
The instrumen-tation proposed by the applicant to supplement the existing operative instrumentation is considered to be sufficient in quantity and placed appropriately to permit assessnent of the structure's pressure-carry-ing capability for the acceptance test.
+
-e
- - awg
,