ML19329A565
| ML19329A565 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 01/06/1972 |
| From: | Peltier I US ATOMIC ENERGY COMMISSION (AEC) |
| To: | US ATOMIC ENERGY COMMISSION (AEC) |
| References | |
| NUDOCS 8001070562 | |
| Download: ML19329A565 (1) | |
Text
-
~
i 0
Docket No. 50-269 -
l vtus A hand calculation was made of the leak rate for Oconee 1 'using data 'from the October 29, 1971 report " Integrated Leak Rate Test 'of 'the Reactor containment Building."
Two cases were calculated:
2:15 to 12:15 (Fuli 18 hr. interval)
Time
=
73.375829, psia (uncorrected)
Initial Pressure
=
85.341498 F Initial Temperature 73.172256, psia (uncorrected) l Final Pressure 83.855699 F 1
Final Temperature
=
1 psia Vapor Pressure
=
.012 L
=
7:15 to 12:15 (La' t 5 hr. Interval)
~
Time s
73.249397,(uncorrected)
Initial Pressure 84.388097 r Initial Temperaturc
=
73.172256 psia (uncorrected)
' Final Pressure 83.855699'T Final Temperature 1 psia Vapor Pressure
=
.045 L
=
The difference in the calculated t asults not withstanding arithrmtic precision indicates that early biases in heasured data influence the leak rate on the low side (for the Oconee 1 leak rate test). However, over the second half of the 10 hr. test period the measured leak rate of.045 compares favorably with the predicted.0474 value.
Ib bg Ibibr PWR;4 DIVES 16b of Reidtbr i.iEehsing
%%d PWR-4
,\\-
o,nce,,
IAFelti op 1LLLn un>
(
F,an AEC-Sts lRev,9-33) AECM 0240 o u s covemmasut enwvam aret. nour rse 8001070 N ]
1