ML19329A402
| ML19329A402 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 06/14/1973 |
| From: | Muller D US ATOMIC ENERGY COMMISSION (AEC) |
| To: | Goller S COMMERCE, DEPT. OF |
| Shared Package | |
| ML19329A403 | List: |
| References | |
| NUDOCS 8001030972 | |
| Download: ML19329A402 (3) | |
Text
.
.o-v DISTRIBUTION Docket Files E'-2 Reading RP Reading EP-FM-RClark EP-W RWade S
AEC PDR Docket Nos.@26 Local PDR 50-270
/
and 50-287
- +.,.
I Dr. Sidney Galler Deputy Assistant Secretary for Environmental Affairs U. S. Department of Commerce Room 3425 14th & Constitution Avenue, N.W.
20230 Washington, D. C.
1 4'
Dear Dr. Galler:
h Operation An Addendum to the Final Environmental Statement Related to t ed for y of Oconee Huelear Station Units 1, 2 and 3 is anclose f Oconee The " Final Environmental Statement ralsted to the operation o f Licensing Nuclear Str. tion _ Units 1, 2 and 3" was published by f the simultanacos in March l'172.
that "this statement considers the environmental impact ot the time was conce operation of all three units," althoughithe action a Unit 1.
with the proposed issuance of a license'to operate for Unit 2 In concection with the proposed issuance of operating licensesd and it w and 3, the Final Environmental Statement was reviewe d evaluation of the that the Statement sets forth an adequate analysis anNevertheless, this Addendf environmental impact of the proposed actions.
ort on the Station's to the FES is issued in order to provide a progress rep"need for power" infor-continuing monitoring program and to update certainThe dingly, the importance to warrant its circulation for ca===st, mation.
l Statement.
Sincerely,
/s/ original sighed by Daniel RIMuller Daniel R. Muller, Assistant Director l
l for Environamatal Projects l
Directorate of Licensing c
l l
i f
SEE ATTACHED DRAFT FOR OGC 'S CONCURRENCE
,,,,,,f L: EP-2..
ADEP w
,,J Gkp _
T L(EP,-2
.,,L :
2 DRNp/er
~
-A omet >
ll GKDicker 5,J.,. n n
.......... 1 XW
. 8,rk
_1.9f....p..
......,6/t.3/73 6//z/73 d
k
- 1' sunNAME>
.M3113.....
6&.gt73 l-om.
.ea-se-ssess-s 444-e7s eeo fons AEC Sta(Rev.9-53) AECM 0240 8001080 f d
a
.+
v.
DRAFT' RClark:dvw June 12, 1973 Docket Nos. 50-269 50-270-Land 50-287 4:
. i The " Final Environmental Statement related to the Operation of Oconee Nuclear Station Units 1, 2 and 3" was published by the Directorate of Licensing in March 1972. Paragraph 2 of the Summary and Conclusions pointed out-that "this statement considers the environmental impact of the simultaneous operation of all three units," although the action at i
.the time was concerned with the proposed issuance of a license to operate
-Unit 1..
In connection with the proposed issuance of operating licenses for Unit 2 and 3, the Final Environmental Statement was reviewed and it was determined that the Statement sets forth an adequate analysis and evaluation of the environmental impact of the proposed actions.
i Nevertheless', this addendum to the FES is issued in order to provide a progress report -on the Station's continuing monitoring program and -
l
~
~to' update certain "need for' power" information. The information set forth in this' addendum is not of sufficient inportance to warrant its circulation for comment, and accordingly, the Addendum is being issued M.'
I
1
. '~
cas a part of the Final Environmental Statement.
On the basis of the analysis and evaluation set forth in the Final Environmenta Statement, as supplemented by the material i s addendum the environmental, economic, techni and other and af ter weigh h6,\\benefitsofOconeeNUclearStation
\\ringavailablealternatives,itisconcluded and other costs and co
/
that the findings in the FES are reaffirmed; that the monitoring programs have been developed and are incNorp /
ated as part of the Technical Specifica-
/
4 tions for the Oconee Station;' and tha the further actions called for
/
under the National Environmental Policy Act f 1969 (NEPA) and Appendix D
/
to 10 CFR Part 50 are/ the issuance of operating icenses for Oconee Unit 2
/
/
and 3, subject to the condition that the applicant s 11 continue and modify f
as necessary the comprehensive monitoring program describ in Appendix B ta operating License No. DPR-38 Technical Specifications for qit 1 which s
will be made a part of any licenses issued for Units 2 and 3.
Sincerely, Daniel R. Muller, Assistant Director for Environmental Projects Directorate of Licensing L
2 L-2 OGC L:EP-2 ADEP
{.l
?$Y
. f 0.h*
Wade:dvw ark D01 son GKDicker DRMuller 6/rv/73 6//%/73 6/ /73 6/ /73 6/ /73 H-
.