ML19329A387
| ML19329A387 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 01/30/1978 |
| From: | Long F NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Seyfrit K NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| Shared Package | |
| ML19329A386 | List: |
| References | |
| NUDOCS 8001030961 | |
| Download: ML19329A387 (1) | |
Text
,E" MC af, tNti t I) 01 ATFS
/
f
'q
.sCLEAlt MEGULATORY COMMISSION -
$M' t
n o REGloN 11 I $
230 PE ACHTREE STREET. N.W. SUITE 1217 j.
' g Q 'jh / f ATLANT A. GEORGIA 30303
%.... ~. 'd' January 30, 1978 MEMORANDUM FOR:
K. V. Seyfrit, Assistant Director, Division of Reactor Operations Inspection, IE:HQ FROM:
F. J. Long, Chief, Reactor Operations and Nuclear Support Branch, Region II
REFERENCE:
Memorandum dated 1/12/78 from J. C. Stepp to A. Schwencer
SUBJECT:
SEISMIC MONITORING INSTRUMENTATION AT OCONEE NUCLEAR STATION, DOCKET NOS. 50-269, 50-270 AND 50-287 This is in response to your telephone request of January 13, 1978 regarding one of the recommendations in the referenced memorandum.
The strong motion seismic monitoring instrumentation installed at the Oconee Nuclear Station was reviewed during the inspection conducted on January 23-27, 1978.
The review included visual examination of accessible instrumentation and verification that the system is functional.
The inspector examined the triaxial accelerometer package and the starter package located in the Unit 1 tendon access gallery and the control and recorder' panels located in the Unit 1 cable room.
The triaxial acceler-ometer located within the Unit I reactor building was not examined.
A calibration'and functional test was last performed on January 4, 1978.
Review of this record revealed the system is operational and no seismic disturbances have been recorded. The event indicator located on the control panel in the Unit 1 cable room is checked weekly by the plant operators.
Additional details of the inspection findings are presented in IE Inspection Report Nos. 50-269/78-1, 50-270/78-1 and 50-287/78-1, Details I, paragraph 6.
D
[
u
% ) I L ghie i
F. J. Long, C l
Reactor Operations and Nuclear Support Branch f