ML19329A376

From kanterella
Jump to navigation Jump to search
Forwards Safety Evaluation Rept Re Proposed Integrated Surveillance Program
ML19329A376
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 05/27/1977
From: Shao L
Office of Nuclear Reactor Regulation
To: Goller K
Office of Nuclear Reactor Regulation
Shared Package
ML19329A377 List:
References
NUDOCS 8001030949
Download: ML19329A376 (1)


Text

_ _

.o Q

e l

MAY 2 71977 9M7 i

MEMORANDUM FOR:

K. Go11er Assistant Director for Operating Reactors, Division of Operating Reactors FROM:

L. C. Shao, Chief. Engineering Branch Division of Operating Reactors

SUBJECT:

OCONEE 1, 2 and 3; SAFETY EVALUATION REPORT ON THE PROPOSED INTEGRATED SURVEILLANCE PROGRAM I

In accordance with your request, the Engineering Branch has evaluated the reactor vessel surveillance program submitted by Duke Power Co.

for the Oconee plants on January 4 and March 10, 1977. We have con-cluded that their proposed integrated, augmented surveillance program is adequate..Our portion of the Safety Evaluation is attached.

I L. C. Shao, Chief Engineering Branch Division of Operating Reactors

{

I i

Contact:

W. Hazelton 28060

Enclosure:

As stated cc:

E. Case DISTRIBUTION:

V. Stello Central File D. Eisenhut EB-Rdg J. Guibert file No.

R. Cudlin L. Shao R. Reid G. Zwetzig A. Schwencer 3

J. Neighbors pf#

i J. Knight S. Pawlicki K. Hoge P. N. Randall 1

W. Hazelton J

772210346 g=g sq wa ww

^o:ma

_ENRandall.imb.dgI YH LCSko g70GOs'eIhut

., r _

On_

.u.u=*

Ji/Iy/27 '

, SAf/IZ

, _5 H7 5/g'/77 5/A177 J

.. =

  • W u. s. sovannumwr eninvine orrscue sob - sas sa4

, NRC PORM 518 (9 76) NRCM 0240 76p

'