Request for Acceleration of Facility ECCS Evaluation Schedule
ML19329A358
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 10/06/1975
From: Purple R
Office of Nuclear Reactor Regulation
To: Varga S
Office of Nuclear Reactor Regulation
References
751010-01, 751010-1, NUDOCS 8001020942
Download: ML19329A358 (1)


Text

-

V j

DISTRIBUTION (Docket File ~

ORB #1 Reading Subj Filo DCT 6 1975 RAPurple KRGoller Steve Varga, Technical Assistant to Director, DRL TilRU: Karl R. Goller, Assistant Director for Operating ker ; tors REQUEST FOR REVISION OF OCONEE UNIT 1 ECCS EVALUATION SGIEDULE (DOCKET NO. 50-269)

It is requested that the target date for the Reactor Systems Branch input for the ECCS evaluation of Oconee Unit 1 be changed from January 30, 1976, to November 28, 1975. This change is necessary due i

to the estimated date, December 12, 197S, at which Oconee Unit I will reach 250 EFPD of operation on its current cycle. The present techni-cal specifications do not include a curvo for Control Rod Group With-drawal Limits for 4-pump operation after this point because it was determined during the evaluation of the Cycle 2 amendment request that the ECCS IAC were not met for this pump combination beyond 250 EFPD.

Rod withdrawal limit curves appropriate for opeaation beyond 250 EPPD have been included in the licensee's July 9,1975, ECCS FAC submittal. Thus, the ECCS review must be completed sooner than presently scheduled in order to prevent facility power reductions.

Original Signed by Kv1 Goller Robert A. Purple, Chief Operating Reactors Branch #1 Division of Reactor Licensing ec:

G. Zech S. Sheppard D. Eisenhut T. Carter s.nc,_

RL:0RB#1 RL ? 01@#

RL:0R gp 1

yGZecTt:dc RA

.XRGolle II

.e,[ 10/6/75' 10/6/75 g6/75 M