ML19329A350

From kanterella
Jump to navigation Jump to search
Reviews Technical Assistance Request 1327.Data in Util Amend to FSAR Insufficient to Support Conclusions on Spent Fuel Cask Overhead Handling Sys Acceptability
ML19329A350
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 08/15/1975
From: Tedesco R
Office of Nuclear Reactor Regulation
To: Golle K
Office of Nuclear Reactor Regulation
References
NUDOCS 8001020929
Download: ML19329A350 (2)


Text

- _ _ _.. - _ _ - _ - _ _ _ _ _ _ _ _ _ _ _ _

r o

e o

DISTRIBUTION:

e

[DrrkerFilD i

' NRR Reading i

CS Reading I

APCSB Reading j

AUG 151975 i

i 1

Docket Nos.

50-269 50-270 50-287 Karl R. 'Coller, Assistant Director for Operating Reactors, RL REVIEW OF TECIMICAL ASSISTANCE REQUEST - OCONEE Hf.NDLING SYSTDfS (TAR 1327), AUXILIARY AND POWER CONVERSI0t; SY I

We have reviewed the above Technical Assistance Request and determined that Duke Power Company's amendment to Oconee PSAR deca not contain sufficient date to support the conclusions on spent fuel cask handlinz system acceptability.

The licensee should provide additional information to demonstrate that:

I (1) An accidental drop of any spent fuel cask to be used at Oconee will not result in an imacceptable release of radioactivity or damage l

The evaluation should cover the to safety related equiptaent.

entire spent fuel cask travel path and should include cask drop /

tip analysis in the area of the spent fuel pool as well as calculations I

demonstrating capability of structures to withstand the miinum cask i

drop without loss of ftstetion and/or adequate protection for safety related equipment, or:

l (2) The overhead crane for spent fuel cask handling neats the single t

failure proof criteria set forth in Branch Technical Position APCSB 9-1, a copy of v.tich is attached.

Ve find the overhead crane systems for spent fuel cask handling not' l

}

acceptabic.

Original Signedbg j,' t##

i f/ linhert L.Tedesegj Robert L. Tedesco, Assistant Director for Containment Safety Division of Technical Reviev 1

Of fice of Nuclear Reactor Regulation l

n APCSB:CS;TR APCSB:CS:'PR APCSB:CS:TR_. p/TR f

DFis k

.,,se,

  • VBenaroya rte go

)

RG c_

8/ h75

,_8/ b /75

. R//J_/.25

_8/L 175

r. *
  • u. s.sovansenesser entweises orrects sera.sassee 8001020f

[J

/

Foran ABC 318 (aer.9 53) ABCM 0240

1 a

c-Karl n. Goller AUG 151975 cc: S.11anauer, TA W. Mcdonald, MIPC A. Giambusso, RL 7

I R.11eineman, TR R. Purple, RL V. Teenaroya, APCSB Donough L

c D. r'ischer, APCSB P. Matthews, APCSr.

J. Glynn, CS R. Ciardina, APCSB D. Eisenhut, NRR E. Jacobs, CS I

l

{

t t

orr,c. >

s u..a u. >

b*

oa,e >

j 1-. m n.<mo. sn ucuono

  • u....o............o,,,c......

P b

f