ML19329A323
| ML19329A323 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 10/07/1974 |
| From: | Goller K US ATOMIC ENERGY COMMISSION (AEC) |
| To: | Schroeder F Office of Nuclear Reactor Regulation |
| References | |
| ORB-1-102, NUDOCS 8001020897 | |
| Download: ML19329A323 (1) | |
Text
s 1
'_ a g
t OCT 7 1974 F. 'Jehtoeder, Acting Deputy Director for Technical Review, L TECHNICAL ASSISTANCE REQUEST NO. ORB-1-102 Your assistance is requested for the following:
PLANT NAME:
Oconee Unit 1 DOCKET NO:
50-269 RESPONSIBLE BRANCH:
ORB-1 i
CONTACT:
Leo McDonough (ext. 7434)
TECHNICAL REVIEW BRANCH:
Core Performance DESCRIPTION OF REQUEST:
Duke Power Company has submitted the attached proposed license amendment, Technical Specification changes, and supporting B&W report in anticipation of the second fuel cycle operation of Oconee Unit 1.
Technical Review is requested to review the proposed
{
Technical Specification changes and the supporting analysis for acceptability. Because second fuel i
l cycle operation is scheduled to commence on l
November 20, 1974, you are requested to complete
{
your review as soon as possible but not later than October 25, 1974.
TARCET DATE FOR COMPLETION: October 25, 1974 Original Signed by Karl Goller Karl R. Col &er, Assistant Director for Operating Reactors Directorate of Licensing
)
i
Enclosure:
Duke letter dated 9/20/74 cc:
D. Ross (w/ encl)
DISTRIBUTION V. Stello (w/o enc 1)
Docket File T. Carter (w/o anc1)
OR-1 Reading L. McDonough (w/o encl)
TAR File S. Sheppard (w/o encl) ce r.c e
- L OR-1 L:0R-L:0R g g
.Mc onou'gH:dc RPurpip YDSoller-eva a== >
10/7/74 10/7/74 10/y774 pats *
'e.
.. ]
Foran ABC Sit (Rev. 9-53) ABCM 0240 W u. e; oovannuant emisevine arracas ser4.sas.see w
P77 f
.a
.