ML19329A315

From kanterella
Jump to navigation Jump to search
Summarizes Proposed Changes to App B Tech Specs 1.3.1.A, 1.3.4,1.3.5 & 1.6 Re Environ Monitoring.Requests Approval by 750701
ML19329A315
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 05/23/1975
From: Thies A
DUKE POWER CO.
To: Anthony Giambusso
Office of Nuclear Reactor Regulation
Shared Package
ML19329A317 List:
References
NUDOCS 8001020890
Download: ML19329A315 (4)


Text

NRC DISrRIBUTION FOR PART 50 DOCKET NATERI AI.

(TEMPORACY FORM)

CONTROL NO:

5735

~

FILE: INF/Ad FROM: Duke Power Company DATE OF DOC DATE REC'D LTR TWX RPT OTHER Charlotte, N.C.

28201

~

A.C. Thies 5-23-75 5-27-75 XX l TO:

ORIG CC OTHER SENT AEC PC' H

Mr. A. Giambusso

?

3 signed 37 SENT LOCAL r DR XX CLASS UNCLASS PROPINFO INPUT NO CYS REC'D DOCKET NO:

XXX 40 O O/287 DESCRIPTION:

Ler notarized 5-23-75 trans the ENCLOSURES:

Replacement Pages for. changes following info re App. B Tech Specs....

to Oconee App. B Tech Specs.....

(40 cys enc 1 rec'd)

D "[N Y A

~~~

PLANT NAME:

Oconee Units 1-2-3 66m

  • 1 FOR ACTION /INFORMATION Dnt
$-21 7 5.. -

BUTLER (L)

SCHWENCER (L) ZIEMANN (L)

REG AN (E)

W/ Copies W/ Copies W/ Copies W/ Copies CLARK (L)

STOLZ (L) 81Cl5ER (E)

LEAR (L)

W/ Copies W/ Copies W/lCopies W/ Cooies PARR a )

vasca; i n in nut 3unya s,E)

SPF.is W/ Copies W/ Copics W/ Copies W/ Copies KNIELi(L)

TUR E (L)

YOUNGBLOOD (E)

LICEMSII;G PROJECT MANAGER

_ W/ Copies W

opies /

W/ Copies W/ Copies INTERNAL DISTRIBUTION

[bNRG ruh(3)

+ f-I L E m TECH REVIEW DENTON LIC ASST.

A/T IN D.

SCHROEDER GRIMES R. DIGGS (L)

BRAITKfAN GC, ROOM P 506A MACCARY AMMILL H. GEARIN (L)

SALTZMAN OSSidK/ STAFF KNIGHT ASTNER E. GOU LBOURNE (L)

ME LTZ

~

CASE DAWLICKI ALLARD 8@, KREUTZER (E)

GIAMBQSSO SHAO SPANGLER J. LEE (L)

PLANS BOYD.

STELLO Mc MAIGRET (L)

MCDONALD MOOR E (L)

HOUSTON JNVIRO S. REEO (E)

CHAPMAN DEYOUNG (L)

NOVAK WAU LLER M. SERVICE (L)

DUBE (L r)

SKOViiOLT (L)

ROSS DICKER y(;. SH EPPAR D (L)

E. COUPE GOLLER (L) (Ltr)

TPOLITO KNIGHTON M. SLATER (E)

PETERSON P. CO LLINS lEEDESCO YOUNG BLOGD H. SMITH (L)

HARTFIELD (2)

DENISE e6. COLLINS EGAN S. TEETS (L)

KLECKER

' J _E G O R R LAIN AS O E T LDR G. WI LLI AMS (E)

EISENHUT UFILE &; REGION (2)

SENAROYA V. WILSON (L)

.WIGGINTON MPIC WOLLMER HAR LESS R. INGRAM (L)

STEELE f

EXTERNAL DISTRIBUTION

/6/.f. I[

- LOCAL PD R unthalla, 'S.C.

- TIC (ABERN ATHY)

"':'::: -i ATIONAL LABS Ob b 1 - PDR SAN /LA, Y

- NSIC (BUCHANAN) 1 - W. PENNINGTON, Rm E 201 G T 1 - BROOKHAVEN NAT 1 - ASLB 1 - CONSU LTANTS 1 - G. ULRIKSON, ORNI

- Newtor wierson NEWM ARK /8 LUM E/AG BABI AN 1 - AGMED (RUTH GL'S ACRSm/SENT Rm B.127 GT 3 - J. D. B U N K L E'S. R -

GT 8001020 h O

Duxz POWER COMPJLYY U' 4 a

,, c.y Powra Buzz.orno 4aa Sourn Cnunca Srazer, CuAnzorrz, r! C. asson A. C. THIES SENIOR veCE PRESIDENT P. o. BOK 2178 PRODUCTION AND TRANSMISPON

,..N

~

May 23, 1975

...,q o

-r

\\ e, e *'

  1. \\

A

.pL, N

.Y s

s gl' ffg

~

e Q @ j, i Mr. Angelo Giambusso, Director

(

Division of Reactor Licensing NC'.c

((k{h Ig

.,. /p U. S. Nuclear Regulatory Commission Washington, D. C.

20555 Re:

Oconee Nuclear Station

~

Docket Nos. ED-2693 -270, -287

Dear Mr. Giambusso:

Pursuant to 10 CFR 50.90, changes to the Oconee Nuclear Station Appendix B Technical Specifications, as shown on the attached replacement pages, are hereby requested. A summary of the proposed changes, and a justifi-cation for each, is presented below:

1 1.

It is requested that Specification 1.3.1.A, " Water Quality," be changed such that the temperature, dissolved oxygen and BOD sample depths are altered and are specified in meters rather than feet.

This will provide data which is more compatible with investigations initiated by Duke and other research groups.

In addition, the depths will be expressed in the presently accepted scientific units.

2.

It is requested that the sampling locations in Specification 1.3.4, "Phytoplankton-Zooplankton Receiving Water Studies," be changed.

Presently the geographical location of two points along the center-line of the Keowee River arm of Lake Keowee is determined each i

sampling period and represents the points at which the plume surface temperature is 0.9 and 0.5 of the temperature excess of the discharge over ambient surface temperature.

It is extremely difficult to remain at the poincs where the 0.9 and 0.5 temperature excesses over ambient surface temperature are located.

Fixed points will permit better comparison between thermally affected stations as well as facilitate sampling.

Data supporting this request is presented in the Oconee Nuclear Station Semiannual Reports for the periods ending June 30 and December 31, 1973 and June 30 and December 31, 1974.

5735

p

-~

~

iq Mr.'Angelo Giambusso Page 2 Mayl23,;1975 3.

It is requested.that Specification 1.3.5, " Benthos," be changed such that the Keowee River below the Keowee Dam be referred to as Lake Hartwell.

Also, a change of sampling stations from 605 to 606 is requested as it'is impossible to sample safely and effectively at 605 because of the very compact nature of the bottom material

'and the periodic swift currents. Data supporting this recommendation are presented in the Oconee Nuclear Station Semiannual. Reports for the periods ending June 30 and December 31, 1973 and June 30 and December 31, 1974.

4.

It is requested that Specification 1.6, " Plume Mapping for Temperature and Dissolved Oxygen" be changed'to delete the requirement for sampling on a seasonal basis.

The conditions during which a sample is required are specified and these studies will not be strictly on a seasonal basis.

Therefore, the reference to a " seasonal basis" is unnecessary.

The data required by Appendix B, Technical Specifications are reported on a semiannual basis.

It would be appropriate to make these changes at the beginning of the next reporting period.

Therefore, it is requested that you review and approve these proposed changes by July 1, 1975.

Very truly yours, Y M A. C.'Thies ACT:vr Attachment

4 n

Mr. Angelo Giambusso Page 3

'rly 23, 1975 A. C. THIES, being duly sworn, states that he is Senior Vice President of Duke Power Company; that he is authorized on the part of said Company to sign and file with the Nuclear Regulatory Commission this request for amendment of the Oconee Nuclear Station Technical Specifications, Appendix B to Facility Operating Licenses DPR-38, DPR-47 and DPR-55; and that all statements and matters set forth therein are true and correct to the best of his knowledge.

S A. C..Thies, Senior Vice President ATTEST.

hj

~

[pnC. Goodman,Jr.'

frssistant Secretary Subscribed and sworn to before me this 23rd day of May, 1975.

Ii MX-t '

mt Notary Public My Commission Expires:

c' l N

'2 W l f' 'l

/

/

_