ML19329A211

From kanterella
Jump to navigation Jump to search
Forwards Safety Evaluation Supporting 760527 Proposed Changes to Radiological Monitoring
ML19329A211
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 11/29/1976
From: Eisenhut D
Office of Nuclear Reactor Regulation
To: Goller K
Office of Nuclear Reactor Regulation
Shared Package
ML19329A213 List:
References
NUDOCS 7912300254
Download: ML19329A211 (1)


Text

,\\p' :

NOV p g g l

MDIORANDUM FOR: Karl R. Goller, Assistant Director for Operating j

Reactors, DOR t

FROM:

Darrell G. Eisenhut, Assistant Director for Operational Technology, DOR I

SUBJECT:

RADIOLOGICAL MONITORING PROGRAM PLANT NAME: Oconee Unit Nos. 1, 2 and 3 DOCKET NIRIBERS: 50-269, 270 and 297 RESPONSIBLE BRANCil: ORB-1 PROJECT MANAGER:

J. Neighbors REVIEW STATUS: EEB - Complete Reference is inade to the request of Duke Power Company of May 27, 1976 to make various changes in the Technical Specifications concerning the l

control of radioactive liquid and gaseous ef fluents frota the Oconee Nuclear Station. A Safety Evaluation covering these changes is en-closed.

This review was performed by R. Clark, S. Block and J. S. Bland, Environmental Evaluation Branch.

c, igtrl ricned by i

g _,, c _. :. 3 ; rd3 Darrell G. Eisenhut, Assistant Director for Operational Technology i

Division of Operating Reactors Office of Nuclear Reactor Regulation i

1 closure:

As stated DISTRIBUTION:

cc:

V. Stell Central Files A. Schwencer EEB Reading G. Zech D. Eisenhut B. Grimes D. Davis L. Barrett R. Clark S. Block bD

Contact:

R. Clark, EEB/ DOR g

Mb 28066 y Qj EEB/0T/ DOR EEB/0T/ DOR EEB[dI/

/

AD/O'T,/ DOR RClark h LBhrre BG dei 11/2J/76 11[q/76' 11/;'//76 ll7d/76 a..

I rena ABCr318 (Rev. 9-55) AFCM 0240

  • ua en sevenmusar ensurine orricas ser.sa see 7912800N Q p

.